Laserfiche WebLink
Queen St NW217th Ave NWRiebeck StROAD END (PHASE 3)ROAD END (PHASE 4)SHEET X.3 <br />SHEET X.2ROW 66.0'BIT. 32.0'INFILTRATION BASINROW 66 <br />.0 <br />'45.0'17.0' <br />35.0'17.0'35.0'TEMPORARY CUL-DE-SAC & ROAD END(PHASE 1)124531871Park201922211315141112359101247111412312869101786216Outlot13WETLAND BUFFER SIGNWETLAND BUFFER SIGN"FUTURE THROUGH STREET" SIGN(PHASE 3)"FUTURE THROUGH STREET" SIGN(PHASE 4)BI <br />T <br />. <br /> <br />3 <br />2 <br />. <br />0 <br />'POSSIBLE FUTURE PARKING LOT BY OTHERS10' WIDE ASPHALT TRAILSTOP SIGN (R1-1)STREET NAME SIGNCALL 48 HOURS BEFORE DIGGING:TWIN CITY AREA 651-454-0002MINNESOTA TOLL FREE 1-800-252-1166 GOPHER STATE ONE CALL SITE BASE <br />NW SITE PLANC2.22:46 PM N:\Projects Current\24-0120.00 TCLD Ranch Road\Civil\CAD Files\TCLD Site Base.dwg9/5/2024 <br />DESCRIPTIONDATENO. <br />REV <br />FILE NO.: <br />DWG FILE: <br />CHECKED BY: <br />DRAWN BY: <br />DESIGN BY: <br />DATE: SHEET NO.LAND SURVEYING <br />CIVIL ENGINEERING <br />ENVIRONMENTAL SERVICES <br />13076 FIRST STREET, BECKER, MN 55308-9322 <br />TEL: 763-262-8822 FAX: 763-262-8844 <br />BOGART, PEDERSON <br />& ASSOCIATES, INC. <br />MEADOWSWEET BEND <br />DEVELOPMENT <br />City of Elk River, Sherburne County, MN <br />09/05/2024 <br />24-0120.00 <br />MJM, CJD <br />MJM <br />MJM 1 09/05/2024 REVISION PER CITY REVIEW <br />I hereby certify that this plan, specification, or <br />report was prepared by me or under my direct <br />supervision and that I am a duly Licensed <br />Professional Engineer under the laws of the <br />State of Minnesota. <br />Signed: <br />Date: Lic. No. <br />Christopher J. Dahn <br />5862809/05/2024 NSCALE:0'100'200'1"=100'PROPOSED CONCRETE PAVEMENTPROPOSED ASPHALT PAVEMENTLEGEND:PROPOSED GRAVEL SURFACINGSITE PLAN NOTES:1.ALL CONCRETE RAMPS, SIDEWALKS AND ACCESSIBLE HANDICAPPEDPARKING STALLS TO CONFORM TO CURRENT A.D.A. REQUIREMENTS.2.CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICALLOCATION OF EXISTING UTILITIES PRIOR TO START OF CONSTRUCTION.3.CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES PRIOR TOTHE START OF CONSTRUCTION.4.CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE CITY,COUNTY AND STATE REGULATIONS.5.SITE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PLANSAPPROVED BY THE CITY.6.SEE PRELIMINARY PLAT FOR LOT STANDARDS, SETBACK INFORMATION,ETC.7.THERE WILL BE A $1,000 SURCHARGE ON PATCHES IN BASE COURSEPAVEMENT, NO PATCHES ARE ALLOWED IN WEAR COURSE PER ELKRIVER.APPROXIMATE LOCATION & SIZEOF HOUSE(SEE GRADING PLAN FORSUGGESTED HOUSE TYPE)60'60'Page 35 of 84