Laserfiche WebLink
Elk River Project Components Quantity Cost/Unit Total Cost Percent Construction Cost Match Amount Eng./Design/Const.Admin.Soft Costs Total Out of Pocket <br />1/3 Mobilization 0.3333 35,000 $11,666.67 <br />Trailhead Sign 2 35,000 $70,000.00 <br />Shade Structure 1 35,000 $35,000.00 <br />Picnic Tables 1 2,500 $2,500.00 <br />Interpretive Panels (ER History, Landfill)2 2,500 $5,000.00 <br />Woodland Trails Panel 1 2,500 $2,500.00 <br />Portable Toilet Screen Fence (LF)20 250 $5,000.00 <br />ADA Width Limiter Gate 3 750 $2,250.00 <br />$133,916.67 0.175801335 $32,140.00 Grant funded $26,783.33 $58,923.33 <br />Cost Participation, Features 1-5 <br />Page 58 of 125