Laserfiche WebLink
10% of the project cost is eligilbe for cost share for engineering and design. The "soft costs" are not. <br />Total Out of Pocket <br />$58,923.33 <br />Total Out of Pocket <br />$75,753.33 <br />Total Out of Pocket <br />Page 38 of 125