Laserfiche WebLink
•/i <br />Ells River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Kerzman — Engineering Manager <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />July 9, 2024 <br />6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Fiber splicing continues on the expansion of the fiber loop. Both ERMU and City of Elk <br />River IT staff have assembled a punch list for the contractor to address. <br />• Staff has received network equipment for the water OT network and is working with the <br />vendor to load configuration and complete testing prior to installation. <br />• Staff has been working with City of Elk River IT staff to update fiber mapping to make <br />better splicing information and cable characteristics available. <br />• Staff has sent out requests for quotations for the East substation high voltage circuit <br />breaker and worked with DGR to prepare specifications and advertise for bids for the <br />East substation transformer. Bid opening is scheduled for August 1, with expected <br />award at the August commission meeting. <br />• The operations director and I met with RJM Construction on July 2 to review a list of 10 <br />warranty items for the field services building and continue to work on remaining <br />closeout items. <br />Page 1 of 1 <br />