My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1f ERMUSR 06-04-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
06-04-2024
>
6.1f ERMUSR 06-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:46:52 AM
Creation date
6/3/2024 1:32:19 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��i <br />Elk River , <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Sumstad — Electric Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />June 4, 2024 <br />6.1f <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Installed 10 new residential services, which involves the connection of a secondary line <br />once the customer requests service. <br />• Joe Schmidt, safety instructor from Minnesota Municipal Utilities Association, was here <br />on May 29 and May 30 and held safety training on Pole Top/Bucket Rescue and <br />performed on site visits at work locations. <br />• Crews assisted Ames Construction on the Highway 169 Redefine Project, as they were <br />installing stormwater pipes under four underground feeders that cross the highway near <br />Station 14 Substation. <br />• Crews are working on underground replacement in the Sandpiper Addition, located east <br />of Sherburne County Courthouse. <br />• Crews installed 2000 feet of three phase underground primary and a three phase <br />transformer at Plaisted Companies for expansion of their mining operations. <br />• A utility contractor bored into one phase of an underground feeder line near the old <br />Salvation Army location. The damage was not severe enough to cause an outage, and <br />crews spliced the cable and returned to service. <br />• A new overhead three phase bank was installed for an irrigation pivot along 165tn <br />Avenue near the Cargill Complex. <br />• New construction continues in Otsego. We are currently installing a new three phase <br />service on Parkview Avenue to serve a childcare center. <br />• Our painting contractor, Bullfrog Industries, was on site the week of May 20 and painted <br />six streetlights, a three phase transformer, and three 600 amp switchgears. <br />• Our new Temporary Lineworker, Adam Jurek, started on May 28. <br />Page 1 of 1 <br />133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.