Laserfiche WebLink
DGR ENGINEERING <br />► _ : zNMI A I <br />HOURLY FEE SCHEDULE A <br />Personnel <br />Grade <br />Engineer <br />Hourly Rate <br />Technician <br />Hourly Rate <br />Administrative <br />Hourly Rate <br />01 <br />$126 <br />$75 <br />$75 <br />02 <br />$134 <br />$80 <br />$80 <br />03 <br />$142 <br />$85 <br />$85 <br />04 <br />$152 <br />$90 <br />$90 <br />05 <br />$162 <br />$95 <br />$95 <br />06 <br />$172 <br />$100 <br />$102 <br />07 <br />$182 <br />$106 <br />$109 <br />08 <br />$193 <br />$113 <br />$117 <br />09 <br />$204 <br />$120 <br />$125 <br />10 <br />$216 <br />$127 <br />$135 <br />11 <br />$228 <br />$135 <br />$145 <br />12 <br />$241 <br />$143 <br />$155 <br />13 <br />$254 <br />$151 <br />$170 <br />14 <br />$264 <br />$161 <br />$200 <br />15 <br />$271 <br />$172 <br />$249 <br />Reimbursable Expenses: <br />Standard vehicle mileage at the IRS standard mileage rate in effect at the time. <br />2. Survey/staking/heavy duty trucks at IRS standard mileage rate plus $0.25 per mile. <br />3. Other travel, subsistence, lodging at actual out-of-pocket cost. <br />4. GPS Survey Equipment (when used) at $31.25 per hour. <br />5. ATV and UTV Equipment (when applicable) at $12.50 per hour . <br />117 <br />