My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORD 24-12
ElkRiver
>
City Government
>
City Council
>
Council Ordinances
>
2020 - 2029
>
2024
>
ORD 24-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2024 5:07:24 PM
Creation date
5/21/2024 9:36:14 AM
Metadata
Fields
Template:
City Government
type
ORD
date
5/20/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stiiked--ffatighs to be removed <br />Underlines to be added <br />--v <br />2. Accessop Structures <br />u <br />Front Setback <br />25' - 0" <br />Side Setback <br />5' - 0" <br />Rear Setback <br />5- 0" <br />Corner Front Setback <br />1 20' - 0" <br />3. Accessoa, structures shall be limited to two -detached structures. <br />4. Total garage space (attached and detached) shall be limited to 1,200 SF. <br />5. All other setbacks shall be consistent with the relevant section of the cit% code. <br />(4) Additional DesiVti Standards: <br />a. Drivewa vs width is limited to 20' — 0" as measured at the front propem line or the <br />entire distance between the curb and sidewalk. <br />b. Drivewa -s must be setback 5'-0" from side pro err lines. <br />c. Internal monotony code <br />1. Adiacent homes shall not repeat the same facade desil,�i or prima , exterior <br />color. <br />2. This standard also applies to the nearest three lots across the street. <br />3. The builder shall demonstrate compliance with this standard when the building; <br />permit is submitted. <br />(5) And standard not specifically described within this section shall remain consistent with <br />the City of Elk River Code of Ordinances. <br />(c) Development Plans. The PUD shall be developed in accordance with the following plans, as <br />amended from time to time. on file at cit} hall. <br />Plan A — Preliminary Plat of Bradford Park as approved b}- the Elk River Citti' Council on <br />l uh 17, 2023, and subject to all conditions of aup proval. <br />Plan B — Bradford Park Phase 1 Construction Plans prepared by ISG and dated March 25 <br />2024. <br />Last Updated January 2023 <br />NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.