Laserfiche WebLink
Parks and Recreation Commission Minutes Page 8 <br /> April 10,2024 <br /> fields to have more organized tournaments in a specific location.When they looked at the fields and <br /> user groups,a lot of ballfields and lacrosse/soccer fields were in their home or niche,more <br /> compacted geographically.The current DAAC location could be used more as an interim recreational "-- <br /> complex that's more youth-driven based on the nature of those fields in being in such proximity that <br /> user groups don't prefer to use the west face field because of the sunset and other safety concerns. <br /> There are a lot of things that need to be improved at DAAC so rather than do that in a tight, confined <br /> space the feeling was to relocate and repurpose and combine the fields at PT Complex. <br /> Commissioner Niziolek asked if we're looking at the long term should the city make good statements <br /> about the fairground being of value to the city maintaining DAAC and expanding the complex. <br /> Commissioner Loidolt said that will incur extra costs and the city already owns the parcels, except the <br /> high school baseball field. <br /> Chair Anderson stated it's hard to see into the future,but he likes the idea of having baseball/softball <br /> on the PT Complex campus. Since there are three new Commissioners,he would like to see the <br /> utilization study findings on page one and then the implementation sequencing and strategy. <br /> Commissioner Stewart would like a sequence summary.They are interlocking puzzle pieces where one <br /> needs to occur before the next can occur,but he's concerned that if we fail on the front,we'll fail on <br /> the back.We need to ramp up the PT Complex first. Would like to build off of the phasing plan. In a <br /> perfect world these are the steps we want to follow but we need to look at off ramps if that sequence <br /> doesn't hold. <br /> Chair Anderson asked what the ultimate action item is down the road. Mr. Stremcha said we would <br /> want a mutually agreed upon concept that will be the pedestal for which the fundraising begins.When <br /> we talk about the next 10-15 years or whatever the Council deems as the appropriate timetable to <br /> move forward with the project,this is the vision for the complex to look like as a finished project. <br /> Conceptually this will be the number of fields,where lacrosse,baseball,and softball have a home, <br /> those are the concepts,not necessarily the finalized design that will go out for bidding.The plan will <br /> be tweaked and be refined over the next decade but it's not necessarily what will be built tomorrow. <br /> This will need to be clarified in the communication piece because once this ends up in the paper <br /> people will be asking how their tax dollars will be used,and that's not the narrative we want to <br /> communicate.This is what we want to see in the future. <br /> Council Member Beyer shared he's a big-picture guy and sees that we're trying to draw people into <br /> Elk River and we're growing at a pace that we need additional fields,but does Elk River want to <br /> grow?What happened to where the city meets the country? Do want to grow to the size of St. Cloud <br /> and Maple Grove or do we want to be Elk River?He wanted to throw that out because that's the <br /> question he's had when there have been great big proposals and want to build big residential areas <br /> where they want the city to buy them a water tower and sewer,which is fine if it's cost neutral,but we <br /> don't want put the burden on the taxpayers. It's great to have long-term goals but it has to fit into <br /> everything else in the city. He appreciates the time the Commission is taking to decipher this. <br /> Mr. Stremcha said this will go to the Council as an awareness piece,there is going to be a consistent <br /> conversation around what the long-term plan needs to be identified, from the standpoint of rebuilding <br /> what we have existing or expanding and what is the philosophical approach to both. <br /> 11VEIE1 11 <br /> NATURE <br />