Laserfiche WebLink
• The back-up dialer unit that calls out system alarms to staff in case the main SCADA <br />system dialer program fails to call out has been upgraded. This will help ensure that <br />system alarms are sent out so that staff are notified of, and are able to react to, any <br />issues that may be happening in the water system. <br />• Verizon wireless has completed their most recent equipment upgrade project at <br />Freeport Water Tower. <br />• The water operators have spent much of their time performing annual preventive <br />maintenance on the water treatment plants. <br />ATTACHMENTS: <br />• February 2024 Pumping by Well <br />• Picture of Well 7 Screen Before Cleaning <br />• Picture of Well 7 Screen After Cleaning <br />Page 2 of 2 <br />240 <br />