My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.7 Web Tools <br />Meters install detail screen: <br />6 CObW I Wark Ord. Deolb 1172a7621 <br />Work Order: 234987925 <br />., ., 24351255 <br />2S <br />LL 200 <br />U�Wee9roun6 <br />39055 <br />6.8 Deployment Progress Tracking <br />During the project onboarding process, Allegiant Utility Services will align with ERMU (Elk River Municipal <br />Utilities) on the desired production schedule. Typically, this is based on cycle and route or substation and <br />circuit depending on the utilities network infrastructure and other considerations. This can be focused on <br />single geographic regions or multiple areas again determined in collaboration with the utility. <br />Allegiant's WMS has two primary views for work order assignment: list view and map view. The same <br />powerful filter and search functionality is available on both views. Filters include status, district, substation, <br />circuit, cycle, route, book, user -defined groups, form factor, technician, and other custom filters. Search <br />includes serial numbers, customer, account, address, and other fields. Filter and search efficiently locate <br />230 <br />
The URL can be used to link to this page
Your browser does not support the video tag.