My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1g ERMUSR 03-12-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2024
>
03-12-2024
>
6.1g ERMUSR 03-12-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:28:17 AM
Creation date
3/12/2024 3:12:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Planning: Upon award, Supplier should provide its detailed process and work flows for meter cycle selection and <br />X <br />cycle requests that it plans to use. As part of the routine execution of its work, the Supplier may be required to provide <br />periodic cycle Requests prior to release of cycle data to Supplier, so that Purchaser can confirm that Supplier's cycle <br />Request meets Al Network Deployment and other business requirements of the Purchaser prior to release and approval. <br />Meter replacements may be suspended during billing windows based on the cycle. Purchaser has provided a file listing <br />specific meters to be installed by month and a listing of the current meter cycle that each meter belongs to but we are <br />not providing any cycle planning scripts. A CIS map can be provided with the general location of each meter. Purchaser <br />may request irrigation and seasonal meters to be done during the months of July -September <br />Wide 9lark—Merere" dead —..Fad <br />oxn <br />neon Simon 9/.anon <br />e./ne, s/wmn 9au�on <br />a sru/tea sn/mn 9/nnon <br />< snva snb/mn m/mon <br />r snsizm3 av mn mnenon <br />z ro/a/mza ie.00n ae./zon <br />38 <br />Yes <br />a ro/zs/z , av/ ,/z av/ b/z <br />a ro/mnnn av/ ,ezmn zV+/zmn <br />r rv,/m 'rlr/mn a/.b/ o <br />z rvv/m a/.<non a/neon <br />�r/.00n <br />< ruu�mn �./won .�nnon <br />wvo.,a ws/mn w.<non <br />wo/tea wunon wunon <br />We will load all Blackout dates into our WOM's <br />a w.�r n w>snon wzenon <br />solution to ensure meters will not be changed <br />out when they are up for billing. <br />Day Look Ahead: Supplier maybe required, on a daily basis, to provide purchaser with a "1-day look ahead" that <br />X <br />contains the key cycles that Supplier intends to deploy meters and modules on. The format of the data should be <br />39 <br />mutually agreed to. <br />yes <br />Information Technology <br />Data Security, Synchronization, and Upload. Through automated means, the Supplier should record Al appropriate <br />X <br />meter exchange and module installation information and provide the data in a common readable electronic format for <br />40 <br />batch upload into Purchaser' IT systems no later than end of the business day. <br />41 <br />Minimum Information Required. The Supplier should list the minimum customer information that Purchaser will need <br />X <br />to supply to perform the work. <br />Batch Completion of AMI Meter Exchange Installation Service Orders- "To Utility", on no less than a daily basis, <br />X <br />Supplier should process the completion of bulk AMI meter exchanges and send to Purchaser's CIS. The file data <br />42 <br />requirements, format, transfer methodology and frequency of these requests should be mutually agreed to between <br />yes <br />Supplier and Purchaser. Note, Attachment IV defines the Integration to Meter Exchange Integration method. <br />Data Elements and Installer Tasks for Electric Change -Outs. The Supplier should capture and transfer the data <br />elements listed below: The Supplier should capture and transfer the data elements listed below: <br />43 <br />ID of the installer. <br />X <br />44 <br />1 Date/time the order is completed. <br />X <br />45 <br />Read from the removed electric meter. <br />X <br />46 <br />Read from the new electric meter. The reading from the electric meter being installed is expected to be zero. <br />X <br />47 <br />Serial number of the electric meter being installed. <br />X <br />48 <br />Sensus FlexNet ID Number. <br />X <br />49 <br />Meter number of the electric meter being removed; if applicable. <br />X <br />50 <br />Follow-up flags indicating that Purchaser should investigate situations found at a premise such as <br />X <br />51 <br />Comments section is to include the correct versus incorrect data found and note follow-up flag details. <br />X <br />52 <br />Premise as -found condition (based on list to be provided by Purchaser). <br />X <br />53 <br />Premise as -left condition (based on list to be provided by Purchaser). <br />X <br />54 <br />Certification that locks and seals are in place -V/N. <br />X <br />Global Positioning System (GPS). The Supplier should capture CPS spherical (latitude, longitude, and altitude) <br />X <br />oordinates for each electric meter with an accuracy no worse than plus or minus three (+/- 3) meters. The process <br />55 <br />description should include specifications for the field device to be used, device settings (e.g., PDOP mask value, etc.), and <br />any differential processing method to be used. Data should be delivered in a format with a spatial reference that can be <br />readily used by Purchaser's' GIS. <br />56 <br />Digital photograph of the as -found meter/meter read. <br />X <br />57 <br />Digital photograph of the empty electric meter can with meter removed. <br />X <br />58 <br />Digital photograph of the as -left meter/meter read (Meter Socket). <br />X <br />59 <br />If repair required, a digital photograph of the electric meter with the meter removed revealing appearance. <br />X <br />205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.