My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 at 1 03-13-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2024
>
03-13-2024
>
7.2 at 1 03-13-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2024 12:17:22 PM
Creation date
3/7/2024 12:17:18 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
3/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUSINESS CENTER DR. NWBUSINESS CENTER DR. NW <br />PARKINGPARKING <br />+/- 124 STALLS+/- 124 STALLS <br />EXISTING EXISTING <br />PARKINGPARKING <br />EXISTING EXISTING <br />PLAYGROUNDPLAYGROUND <br />EXISTING EXISTING <br />SPLASH PLAYSPLASH PLAY <br />EXISTING EXISTING <br />SHELTERSHELTER <br />NEW NEW <br />TRAILTRAIL <br />EXISTINGEXISTING <br />PONDINGPONDING <br />EXISTINGEXISTING <br />PONDINGPONDING <br />BALLFIELDBALLFIELD <br />DRAIN TILE TO DRAIN TILE TO <br />IMPROVE DRAINAGEIMPROVE DRAINAGE <br />DRAIN TILE TO DRAIN TILE TO <br />IMPROVE DRAINAGEIMPROVE DRAINAGE <br />SHELTERSHELTER <br />PLAZAPLAZA <br />BALLFIELDBALLFIELD <br />280’280’ <br />MULTI-USE MULTI-USE <br />FIELDFIELD <br />280’280’ <br />280’280’ <br />280’280’ <br />EXISTING EXISTING <br />POWER POWER <br />LINESLINES <br />EXISTING EXISTING <br />DOG PARKDOG PARK <br />280’280’ <br />21 <br />0 <br />’ <br />21 <br />0 <br />’360’360’280’280’ <br />0’0’100’100’ <br />ELK RIVER PARKS & RECREATIONATHLETIC FIELDS MASTER PLANS <br />DAVE ANDERSONATHLETIC COMPLEX <br /> »Removes 2 softball fields and replaces them <br />with open field space that can accommodate up <br />to a full sized rectangle field or multiple youth <br />sized fields <br /> »Improves safety considerations by reducing the <br />number of softball fields and having play occur <br />behind spectators <br /> »Installation of drain tile in the outfields to reduce <br />flooding/ponding that is occurring today <br /> »Addition of a centralized plaza and shelter to <br />support recreational field use <br /> »Creation of new parking to support field <br />programming, as well as Orono Park <br /> »Retains flexibility for potential long term change <br />with adjacent land uses
The URL can be used to link to this page
Your browser does not support the video tag.