My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 03-04-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
03-04-2024
>
7.2 SR 03-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 10:50:07 AM
Creation date
3/1/2024 9:36:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description of Project Narrative <br />Detailed description/scope of project. <br />What is being proposed? <br />Project proposed includes an addition ofan approx. 36,000 s.f. fieldhousefirst floor (plusapprox.24,000 <br />s.f. second floor)and remodeling oftheexisting 9,585 s.f. high school gymnasiuminto an <br />auditorium/performing arts center. <br />How is the request consistent with City of Elk River Comprehensive Plan? <br />The zoning change allows current and future projects to be completed within the accepted zoning use <br />instead of the ordinance controlling use within the current industrial park. The zoning change allows the <br />City of Elk River Planning Department and City Council to continue theintent to disallow educational <br />use within the business park (non-PUD sites) while also working with Spectrum High School to fulfill <br />the intended goal numbers on property already owned by the school/building company. <br />Hours of Operation 7:00a.m.-3:30p.m. <br />Number of EmployeesStaff -103 full-time and 90part-time <br />Students approximately 1,000 at full capacity <br />Number of parking stalls High School -Existing: 264 <br />Sixth Grade (condominium) Existing:65 <br />7/8 Grade Center Existing: 57 <br />Donated property -Physical education field (future) 100-113 parking <br />potential <br />Is there proposed screening of the site? <br />No <br />Proposed building materials <br />How do they comply with applicable design standards? <br />Materials to be matching Precast Panels to existing building(s) <br />Materials comply with applicable design standards and are the most compatible with the existing <br />building architecture being added onto. Design and construction is consistent with other building in the <br />immediate area. <br />Signage (at time of installation, a separate permit is required for each sign) <br />How many? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />Proposed sizes? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />Locations? <br />Unknown at this time. A separate design and permit process will be followed if signage added <br />What type? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />Is there outdoor storage? What is being stored? <br />Outdoor trash and storage exists from prior projects.No change is proposed no change in use or <br />population? <br />Page 4of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.