My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 03-04-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
03-04-2024
>
7.2 SR 03-04-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 10:50:07 AM
Creation date
3/1/2024 9:36:31 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
last city approval in 2017, which permitted construction of the middle school building at 17823 Industrial Circle. <br />After that approval, the City Council directed staff to remove educational uses as an allowed use in the Business <br />Park zoning district, and all three Spectrum Facilities along Industrial Circle have been considered legal non- <br />conforming uses since that change. The school has continued to operate under the legal non-conforming status <br />but has recently been reviewing possible changes to their middle and high school buildings to support their <br />academic and sports programming. <br /> <br />The requestdoes not include an increase inthe number of students (1,000 students in grades 6 to 12),whichwas <br />permitted with their last approval in 2017. Their proposal to establish a PUD would only support the construction <br />th <br />of additional facilities on the current middle and high school properties. The 6 grade building, which is part of a <br />larger industrial condo building, would not be included in the PUD district and would continue to operate as a <br />legal non-conforming use. <br /> <br />Approval of the PUD district will provide spectrum with an opportunity to grow within the current property <br />boundaries of the middle school building (17823 Industrial Circle), and the new high school parcel created with <br />the plat of Elk River SBC Addition. Once the PUD has been approved and recorded, future building or site <br />additions, not supporting additional students, will require an administrative site plan review and a building permit. <br /> <br />PUD Concept Plans <br />The current PUD concept plans include an addition of an approximately 36,000 SF field house and a 13,000 SF <br />classroom addition to the middle school building, remodeling of the existing high school gymnasium, a recreation <br />field and parking expansion west of the high school, and a maintenance and storage garage. The submitted <br />concept plans show a general layout and location of the uses, but the final plans may differ from these concepts <br />and will require subsequent review and approval by city staff. <br /> <br />Building materials, design choices, parking standards, and setbacks must match the requirements of the Business <br />Park district to ensure continuity with the surrounding industrial properties. <br /> <br />Staff reserve the right to require parking and traffic analysis for any future additions to verify traffic from the <br />school will not detrimentally impact the operation of the surrounding industrial uses. <br /> <br />Applicable Regulations <br />Zone Change <br />In reviewing a proposed amendment, consideration shall be given to existing conditions within the area directly and indirectly affected by <br />the proposal, the conservation of property values, the use to which the property affected is being devoted at the time, and relevant <br />provisions, if any, in the land use plan. <br />The current middle and high schoolparcels are zoned BP (Business Park). The outlot west of the high school <br />parcel, a portion of which is included in the proposed plat of Elk River SBC Addition is zoned I-1 (Light <br />Industrial). The requested rezoning includes the existing middle school parcel and the proposed high school <br />parcel. The rezoning to PUD must occur after approval of the Elk River SBC Addition plat. <br /> <br />The proposed uses on these parcels would not change, but the request supports expansion of existing uses on the <br />same sites they currently have approval to operate. The student count will not change, and the overall impact to <br />the surrounding parcels will be minimal. <br /> <br />Conditional Use Permit/PUD <br />City ordinances outline the process for reviewing a proposed PUDproject and include a series of standards that <br />the proposal should be evaluated against. Sec 30-1564 outlines thesestandards as follows: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.