My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 02-27-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2024
>
02-27-2024
>
5.3. PCSR 02-27-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 1:13:00 PM
Creation date
2/23/2024 1:09:48 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in the City of Elk River’s Comprehensive Plan. Vireo Health's project is the interior buildout of the <br />existing structures. No modifications to the pervious and/or impervious areas of the site will be <br />made in conjunction with this project. Any exterior equipment will be located in areas where <br />impervious surfaces currently exist. Anticipated modifications to existing utility services to the site <br />will be coordinated with ERMU. The developed portion of the building will be connected to ERMU <br />electrical service, water, and sanitary lines. The required electrical service is 480V/7000 AMP <br />divided into (1) 4,000 AMP and (1) 3,000 AMP service. The maximum daily water requirement is <br />9000 gallons. Any required modifications to utility services will not impact stormwater runoff nor <br />areas of pervious and/or impervious areas. There are no wetlands present or impacted by this <br />proposal. This proposal does not meet the threshold requirements for EAW/EIS. <br /> <br />Submitted by: <br />Mark E. Doherty, VP of Facilities and Performance <br />Vireo Health <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.