My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 02-27-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2024
>
02-27-2024
>
5.2. PCSR 02-27-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2024 11:44:27 AM
Creation date
2/22/2024 12:57:21 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/27/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description of Project Narrative <br />❑ Detailed description/scope of project. <br />❑ What is being proposed? <br />Project proposed includes an addition of an approx. 36,000 s.f. fieldhouse first floor (plus approx. 24,000 <br />s.f. second floor) and remodeling of the existing 9,585 s.f. high school gymnasium into an <br />auditorium/performing arts center. <br />❑How is the request consistent with City of Elk River Comprehensive Plan? <br />The zoning change allows current and future projects to be completed within the accepted zoning use <br />instead of the ordinance controlling use within the current industrial park. The zoning change allows the <br />City of Elk River Planning Department and City Council to continue the intent to disallow educational <br />use within the business park (non-PUD sites) while also working with Spectrum High School to fulfill <br />the intended goal numbers on property already owned by the school/building company. <br />[]Hours of Operation 7:00 a.m.- 3:30 p.m. <br />❑Number of Employees Staff - 103 full-time and 90 part-time <br />Students — approximately 1,000 at full capacity <br />[]Number ofparking stalls High School -Existing: 264 <br />Sixth Grade (condominium) Existing: 65 <br />7/8 Grade Center Existing: 57 <br />Donated property -Physical education field (future) 100-113 parking <br />potential <br />[]Is there proposed screening of the site? <br />No <br />❑ Proposed building materials <br />❑ How do they comply with applicable design standards? <br />• Materials to be matching Precast Panels to existing building(s) <br />• Materials comply with applicable design standards and are the most compatible with the existing <br />building architecture being added onto. Design and construction is consistent with other building in the <br />immediate area. <br />❑Signage — (at time of installation, a separate permit is required for each sign) <br />❑ How many? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />❑Proposed sizes? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />❑Locations? <br />Unknown at this time. A separate design and permit process will be followed if signage added <br />❑ What type? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />[]Is there outdoor storage? ❑ What is being stored? <br />Outdoor trash and storage exists from prior projects. No change is proposed — no change in use or <br />population? <br />Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.