My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMU RES 24-2
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Resolutions
>
2024
>
ERMU RES 24-2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 9:28:43 AM
Creation date
2/16/2024 10:02:46 AM
Metadata
Fields
Template:
City Government
type
ERMUR
date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - INTERCONNECTION PROCESS <br />Interconnection Process: In order to provide for coordinated interconnection of <br />customer -owned distributed energy resources and comply with Minnesota Statutes <br />Section 21613.1611, subd. 3(2), Utility has adopted the "Minnesota Municipal <br />Interconnection Process (M-MIP) 2022" as recognized by the Minnesota Municipal Utilities <br />Association Board of Directors at its February 9, 2022, meeting and made publicly <br />available at mmua.orq. <br />General technical requirements may be found in the Minnesota Technical Interconnection <br />and Interoperability Requirements (TIIR) as adopted by the Minnesota Public Utilities <br />Commission on January 22, 2020 as part of DOCKET NO. E-999/CI-16-521. <br />For utility -specific safety standards, required operating procedures for interconnected <br />operations, and the functions to be performed by any control and protective apparatus, <br />please contact Utility for its Technical Specifications Manual (TSM). <br />
The URL can be used to link to this page
Your browser does not support the video tag.