My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.7a ERMUSR 02-13-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2024
>
02-13-2024
>
2.7a ERMUSR 02-13-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 9:22:50 AM
Creation date
2/12/2024 12:21:06 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk Riv4r=.Z-� <br />Municipal Utilities <br />TRANSMISSION TRANSFORMED SERVICE RATE <br />Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br />Applicable: Available for new non-residential Customer accounts with projected annual peak demand <br />greater than or equal to 10 MW. The Customer must maintain a minimum average annual peak demand <br />of 10 MW with an annual load factor greater than 75%. If Customer fails to meet the minimum peak or <br />load factor the Customer may be switched to another electric rate schedule (additional charges may <br />apply to recover stranded costs). The Customer owned equipment must be in compliance with all <br />policies, procedures, safety requirements, and applicable electrical codes. <br />Character of Service: 3-Phase Transmission Transformed 7,200/12,470-volt, AC, 60 cycles. <br />Special Conditions: The Customer must execute a contract with the utility that commits to a minimum <br />term of service, identifies the annual peak demand and load factor, agrees to the requirements for <br />registering generation with Midcontinent Independent System Operator (MISO) if applicable, and <br />accepts the certain risks that include fluctuating market -based rates and prices established by MISO. <br />The Customer must connect directly to the Utility's distribution substation(s) and provide the location <br />suitable for the installation of the utility owned substation transformer(s) and metering equipment on <br />the Customer's property. Customer will be responsible for providing suitable wire and connection in the <br />utility owned metering equipment. The metering equipment shall be installed to service one class of <br />business. If additional buildings are required for a given business, they shall be interconnected by the <br />customer to maintain one metered account, unless an exception is approved by management. If <br />additional meters and services are requested by the customer, each shall be treated as a separate <br />customer and billed individually at applicable rate schedule. <br />ERMU equipment and metering must be accessible to ERMU 24 hours per day. <br />Billing Determinants <br />1. Energy: Actual metered hourly usage. <br />2. Transmission Demand: Monthly maximum metered 15-minute Customer demand, adjusted for <br />applicable MISO zone transmission losses. <br />3. Capacity: Customer shall select one of the options below: <br />a. If the Customer has its own generation, then the capacity billing determinant shall be <br />the maximum metered 15-minute demand in excess of Customer's registered <br />generation in a given billing period. To qualify for the billing determinant in the <br />Page 1 of 3 <br />71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.