My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. PCSR 01-23-2024
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2024
>
01-23-2024
>
5.2. PCSR 01-23-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:35:55 AM
Creation date
1/19/2024 11:29:02 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> <br />Description of Project Narrative <br /> Detailed description/scope of project. <br /> What is being proposed? <br />Project proposed includes an addition of an approx. 36,000 s.f. fieldhouse first floor (plus approx. 24,000 <br />s.f. second floor) and remodeling of the existing 9,585 s.f. high school gymnasium into an <br />auditorium/performing arts center. <br /> <br />How is the request consistent with City of Elk River Comprehensive Plan? <br />The zoning change allows current and future projects to be completed within the accepted zoning use <br />instead of the ordinance controlling use within the current industrial park. The zoning change allows the <br />City of Elk River Planning Department and City Council to continue the intent to disallow educational <br />use within the business park (non-PUD sites) while also working with Spectrum High School to fulfill <br />the intended goal numbers on property already owned by the school/building company. <br />Hours of Operation 7:00 a.m.- 3:30 p.m. <br /> <br />Number of Employees Staff - 103 full-time and 90 part-time <br />Students – approximately 1,000 at full capacity <br /> <br />Number of parking stalls High School - Existing: 264 <br /> Sixth Grade (condominium) Existing: 65 <br /> 7/8 Grade Center Existing: 57 <br /> Donated property -Physical education field (future) 100-113 parking <br />potential <br /> <br />Is there proposed screening of the site? <br />No <br />Proposed building materials <br /> How do they comply with applicable design standards? <br />• Materials to be matching Precast Panels to existing building(s) <br />• Materials comply with applicable design standards and are the most compatible with the existing <br />building architecture being added onto. Design and construction is consistent with other building in the <br />immediate area. <br /> <br />Signage – (at time of installation, a separate permit is required for each sign) <br /> How many? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />Proposed sizes? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br />Locations? <br />Unknown at this time. A separate design and permit process will be followed if signage added <br /> <br />What type? <br />Unknown at this time. A separate design and permit process will be followed if signage added. <br /> <br />Is there outdoor storage? What is being stored? <br />• Outdoor trash and storage exists from prior projects. No change is proposed – no change in use or <br />population?
The URL can be used to link to this page
Your browser does not support the video tag.