Laserfiche WebLink
<br />Heritage Maples <br />January 10,2006 <br /> <br />Page 5 <br /> <br />Staff recommends that the Commission recommend approval of the preliminary plat with <br />the following conditions: <br /> <br />1. A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS <br />AND CONDITIONS OF THE PLAT APPROVAL PRIOR TO RELEASING THE PLAT FOR <br />RECORDING. <br /> <br />2. SURFACE WATER MANAGEMENT FEE BE PAID IN THE AMOUNT REQUIRED BY THE CITY <br />AT THE TIME OF FINAL PLAT PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />3. THE LETTER OF CREDIT SHALL COVER WETLAND MITIGATION. DRAINAGE EASEMENTS <br />SHALL BE IN PLACE OVER THE WETLAND AND THE WETLAND MITIGATION AREAS. <br /> <br />4. RESTRICTIVE COVENANTS SHALL BE RECORDED ON THE WETLAND AND THE WETLAND <br />MITIGATION AREAS. <br /> <br />5. A THREE YEAR MONITORING REPORT ON THE WETLAND MITIGATION IS REQUIRED. <br /> <br />6. THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE PLANS. <br /> <br />7. STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES <br /> <br />8. A LETTER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE <br />COSTS OF THE PUBLIC IMPROVEMENTS. <br /> <br />9. UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY <br />THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE IMPROVEMENT <br />COSTS SHALL BE SUBMITTED TO THE CITY FOR THE PERIOD OF ONE YEAR. <br /> <br />10. A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE PAID <br />PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />11. A GRADING AND EROSION CONTROL PLAN BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO THE ISSUANCE OF BUILDING PERMITS. <br /> <br />12. A DEVELOPMENT PLAN BE APPROVED BY THE CITY ENGINEER PRIOR TO THE <br />ISSUANCE OF BUILDING PERMITS. <br /> <br />13. ALL GRADING BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS. <br /> <br />14. ALL MAILBOXES BE CLUSTERED. <br /> <br />15. A TREE PRESERVATION PLAN BE APPROVED PRIOR TO RELEASING THE PLAT FOR <br />RECORDING. <br /> <br />18. ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF GRADING THAT ARE TO BE <br />PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT THE DRIP LINE TO PREVENT <br />GRADING, COMPACTION, OR STORAGE OF EQUIPMENT, DEBRIS OR MATERIALS. <br />STAFF SHALL INSPECT FENCING PRIOR TO GRADING COMMENCING. <br /> <br />19. WATER ACCESSIBILTY FEES IN THE AMOUNT DETERMINED BY THE CITY BE PAID PRIOR <br />TO RELEASING THE PLAT FOR RECORDING. <br /> <br />S;\PLANNING\Case Files\2005\P 05-16 Heritage Maples\P05-016PC1-10.doc <br />