My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 01-17-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
01/17/2006
>
6.5. SR 01-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:42 AM
Creation date
1/13/2006 9:30:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />January 12, 2006 <br /> <br />File: 226-105P <br /> <br />Mr. Chris Leeseberg <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: 1HE MEADOWS OF ELK RIVER <br />FINAL PLAT <br /> <br />Dear Mr. Leeseberg: <br /> <br />As requested, we have reviewed the final plat of The Meadows of Elk River. The final plat <br />was prepared by John Oliver & Associates. The preliminary plat was approved under the <br />name Au1ik Acres back in December 2005. Based on our review, we would offer the <br />following comments: <br /> <br />1. The final plat follows the approved preliminary plat. <br />2. The same conditions should apply similar to the preliminary plat, in that all comments of <br />the City Engineer and Sherburne County shall be addressed. <br />3. The plat shall pay a sealcoating impact fee of $1,800. <br />4. The public right-of-way of 215th Court is shown as 66 feet wide. City ordinance only <br />requires 60 feet in width. <br />5. Another condition that should be put on the final plat is that proof of ability to <br />construct a conventional trench or mound septic system in a primary and secondary <br />location on each lot shall be provided. . <br />6. The identified septic sites shall be protected during construction of plat infrastructure. <br />7. We have received plans, specifications, and storm drainage calculations from John Oliver <br />& Associates. These are currently under review. We would request to review the final <br />plat for appropriate drainage and utility easements prior to recording. <br /> <br />If you have any questions regarding any of these issues, please call. <br /> <br />Sincerely, <br /> <br />~p~ <br /> <br />Terry J. Maurer, PE <br />City Engineer <br />phone: 763.635.1000 <br />Fax: 763.635.1090 <br />. Ik . S:\PLANNING\Case Files\2005\P 05-21 The Meadows of Elk River (AulikAcres)\0112 06 engr's memo.doc <br />v.,rww.Cl.e -nver.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.