My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6 SR 01-02-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-02-2024
>
4.6 SR 01-02-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:10:32 PM
Creation date
12/29/2023 8:13:26 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tekstar Communications, Inc. d/b/a Arvig <br />Budget/Expenses <br />C1. Budget and Eligible Expenses <br />The total eligible costs of the proposed City of Elk River Area project are estimated to be $542,651.25 for serving the area at an <br />estimated 55% take -rate, covering approximately 6,77 miles of mainline construction.The total estimated funds being requested <br />is $162,795.38 from the County, $217,060.50 MN 13213 grant, and Arvig providing the remaining $162,795.38 for the project. <br />Estimated cost detail is represented by 3 main areas and has been included for reference in the table below. Tekstar/Arvig <br />commits to use County grant awarded ARPA funds and all agency matching contributions from Cities and Townships for the sole <br />purposes of implementing the proposed broadband project. <br />City of Elk River Area <br />Sherburne County RFP Estimated Costs — FTTH Buildout <br />Elk River— Fire Elk River — Twin <br />Station #3 area Lakes Area <br />Total Mainline Footage <br />Material per foot - Mainline <br />Labor per foot - Labor mainline <br />Material per foot -drops - <br />350' average <br />Labor per foot - drops — <br />350' average <br />Unserved/Underserved <br />locations passed <br />Total for construction <br />material -mainline <br />Total for construction <br />labor -mainline <br />PON Cabinet, splitters, etc <br />Total for construction <br />material -drops <br />Total for construction <br />labor -drops <br />Equipment Cost per sub. - <br />$185 <br />Total Cost <br />13915 <br />$2.50 <br />$8.00 <br />$1.50 <br />$4.50 <br />10 <br />$34,787.50 <br />$111,320.00 <br />$12,000.00 <br />$5,250.00 <br />$15, 750.00 <br />$1,850.00 <br />$180,957.50 <br />13340 <br />$2.50 <br />$8.00 <br />$1.50 <br />$4.50 <br />10 <br />$33,350.00 <br />$106,720.00 <br />$1, 500.00 <br />$5,250.00 <br />$15,750.00 <br />$1,850,00 <br />$164,420.00 <br />Total <br />Elk River — <br />Elk Riven <br />Elk Lake <br />A <br />Rd NW <br />13857.5 <br />24.E <br />$2.50 <br />$8.00 <br />$1.50 <br />$4.50 <br />22 <br />42 <br />$34,643.75 <br />$102,781.25 <br />$110,860.00 <br />$328,900.00 <br />$1,500.00 <br />$15,000.00 <br />$11,550.00 <br />$22,050.00 <br />$34,650.00 <br />$66,150.00 <br />$4,070.00 <br />$7,770.00 <br />$197,273.76 <br />$542,651.25 <br />Cost per sub at 100% $18,095.75 $16,442.00 $8,966.99 $12,920.27 <br /># of unserved structures 3 2 22 27 <br /># of underserved structures 7 8 15 <br />Total 10 10 22 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.