My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 SR 01-02-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-02-2024
>
4.2 SR 01-02-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:12:28 PM
Creation date
12/29/2023 8:08:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling Hills Pond Dredging <br />Elk River, Minnesota <br />Install: Placing, erecting, or constructing complete in place any item, equipment, or material. <br />Provide: Furnish and install, complete in place. <br />Punch List: List of incomplete items of Work and of items of Work which are not in conformance <br />with the Contract. The list will be prepared by the Engineer's representative when the Contractor (1) <br />notifies the Engineer's representative in writing that the Work has been completed in accordance with <br />the contract and (2) requests in writing that the Owner accept the Work. <br />Shall: Refers to actions by either the Contractor or the Owner and means that Contractor or Owner <br />has entered into a covenant with the other party to do or perform the action. <br />Submittals: The information that is specified for submission to the Engineer in accordance with <br />Division 1 of the Project Manual. <br />2. Additional Instructions and Detail Drawings <br />Replace Section 2.1 with the following: <br />2.1 The Owner shall furnish to the Contractor six copies of the Contract Documents. Additional <br />quantities of the Contract Documents will be furnished at reproduction cost. <br />10. Surveys, Permits, Regulations <br />Add the following section to Article 10: <br />10.4 The Contractor shall obtain all necessary federal, state, and local permits required for any <br />dewatering and stormwater discharges necessary during construction. The Contractor shall also <br />provide all monitoring and test reporting relating to the discharges. <br />12. Supervision by Contractor <br />Add the following section to Article 12: <br />12.2 Contractor shall maintain a qualified and responsible person available 24 hours per day, seven <br />days per week to respond to emergencies which may occur after hours. Contractor shall provide to <br />Engineer the phone number and/or paging service of this individual. <br />15. Time for Completion and Liquidated Damages <br />Replace Section 15.3 with the following: <br />15.3 Owner and the Contractor recognize that the Owner will suffer financial loss if the Work is <br />not completed within the time specified in the Contract Documents, plus any extensions of time <br />Supplementary General Conditions 00800-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.