My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2 SR 01-02-2024
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2024
>
01-02-2024
>
4.2 SR 01-02-2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 2:12:28 PM
Creation date
12/29/2023 8:08:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/2/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rolling Hills Pond Dredging <br />Ell< River, Minnesota <br />SECTION 00615 <br />Payment Bond <br />Bond No. <br />KNOW ALL PERSONS BY THESE PRESENTS; That <br />a (corporation, a partnership, or an individual), hereafter called Contractor, and <br />(Name of Surety) <br />(Address of Surety) <br />hereinafter called Surety, are held and firmly bound unto <br />City of Elk River <br />13065 Orono Parkway, Elk River, MN 55330 <br />hereinafter called Owner, and unto all persons, firms and corporations who or which may furnish <br />labor or materials, as defined in Minnesota Statute 574, to perform as described under the contract <br />and to their successors and assigns in the total aggregate penal sum of <br />in lawful money of the United States, for the <br />payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, <br />administrators, successors, and assigns, jointly and severally, firmly by these presents. <br />THE CONDITION OF THIS OBLIGATION is based upon a certain contract by and between <br />Contractor and Owner dated the day of , 2023, a copy of which is hereto attached and <br />made a part hereof, for the construction of Rolling Hills Pond Dredging, generally described as <br />follows: <br />Improve various sections of bituminous by means of mill and overlay and/or full depth <br />reclamation. <br />NOW, THEREFORE, if the Contractor promptly makes payment to all persons, firms, <br />Subcontractors, and corporations furnishing materials for or performing labor in the prosecution of <br />the Work provided for in such contract and any authorized extension or modification thereof, <br />including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, <br />equipment and tools, consumed or used in connection with the construction of such Work, and all <br />insurance premiums on said Work, and for all labor, performed in such Work whether by <br />Subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and <br />effect. <br />Payment Bond 00615 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.