My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. SR 01-17-2006
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2006
>
01/17/2006
>
5.1. SR 01-17-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:42 AM
Creation date
1/13/2006 9:13:41 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/17/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />~ <br /> <br />River <br /> <br />TRAFFIC EVALUATIONS <br /> <br />SITE FEASIBILITY STUDY <br />GREAT RIVER REGIONAL LIBRARY SYSTEM <br />CITY OF ELK RIVER <br /> <br />The Transportation Plan adopted by the City of Elk River examines the operational aspects of <br />the local street system, traffic conditions and potential improvements. The Arterial routes - <br />including Orono Parkway and the Orono Road and Main Street are critical major collectors and <br />may impact the desired site location. <br /> <br />SITE ACCESS <br /> <br />Site access points for each of the sites are as follows: <br /> <br />o Site Option A: Access to the existing library <br />site is from "local streets" within a <br />residential neighborhood. There are two <br />access points including Proctor Avenue <br />and 5th Street. The site is strategically <br />located between the "principal arterials" of <br />Highway 10 and the "major collector" of <br />Main Street. <br /> <br />o Site Option B: To access the proposed area <br />of Orono Park identified for this site option, <br />a new street will be required. The site is <br />located between the "principal arterials" of <br />Highway 10 and the "major collector" of <br />Orono Parkway. A secondary access <br />connection may be from the City Hall <br />parking area. <br /> <br />o Site Option C: The site is strategically located <br />on the "major collector" of Orono Parkway. <br />New lanes, curbs, and drives will be <br />required to access the parking at the site. <br />A split entry drive may be used to create <br />two distinct emergency entrances. <br /> <br />SITE TRAFFIC SAFETY <br /> <br />Site safety considerations discussed for each of the <br />sites are design issues to be outlined in the Program <br />of Requirements. Included, as design issues are <br />traffic, pedestrian and lighting considerations. <br /> <br />KKE ARCHITECTS: 0606.1159.01 <br /> <br />- 30- <br /> <br /> <br />SITE FEASIBILITY STUDY REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.