My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 12-18-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
12-18-2023
>
7.2 SR 12-18-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 9:49:27 AM
Creation date
12/14/2023 9:44:25 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />To Item Number <br />Ma Tor and CinT Council 7.2 <br />Agenda Section Meeting Date Prepared by <br />Public Hearings December 18, 2023 Chris Leeseberg, Senior Planner <br />Item Description Reviewed by <br />Zone Change: Planned Unit Development to General Zack Carlton, Communi r Develo ment Director <br />Industrial (I3) at 15777 Jarvis Street and PID # 75- Reviewed by <br />805-0110 Cal PortneY, Ci r Admiiiistrator <br />Action Requested <br />Adopt, byT motion, an ordinance to rezone certain propertyT from PUD to I-3 <br />as the rezoning is consistent with the CityT of Elk River Land Use Plan adopted <br />as part of the CityT of Elk River Comprehensive Plan. <br />Background/Discussion <br />The propertyT is zoned Planned Unit Development (I'UD), and the propertyT <br />owneY is seeking to Yezone the subject pYopeYtyr to I-3 General Industrial, <br />facilitating a Conditional Use PeYmit (CU 23-23) to allow opeYation of a <br />salvage yTard. <br />The subject pYopertyr is 2.12 acYes in size and located east of Jarvis Street south <br />of the railroad tracks. It is surrounded byT I-3 zoned properties and t�vo others <br />zoned PUD. The proposed zone change is consistent with the industrial <br />natuYe of the aYea and the Comprehensive Plan. <br />The attached document shows the uses that would no longer be allowed, as <br />well as additional uses that would be allowed, with the zone change. <br />{ � . <br />� <br />V <br />CR 3d <br />� <br />z <br />RR <br />Hw�,o <br />^ CR 12 <br />�� <br />y``y <br />�o <br />'69 <br />Figure I <br />Comprehensive Plan <br />The Comprehensive Plan guides the propertyT as industrial which includes both heavyT and light industrial <br />businesses such as manufacturing, warehousing, and excavation. These uses are primarilyT located off High�ua�T 169, <br />High�ua�T 10, and the BNSF Railroad which provide easyT access for the transferring of goods throughout the <br />region. <br />The proposed zone change is consistent with the CompYehensive Plan. <br />Applicable Regulation <br />In zevie2a�ing apaoposed alnend7nent, conside�ation sballl�egiven to existing conditions �a�ithin the area directly and indiTectly affected <br />by the p� oposal, tbe conse�vation of p� opeTfy values, the use to �a�hich the prope�yy affected is being devoted at the tilne, and relevant <br />provisions, if any, in the land use plan. <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Update�l• January 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.