My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1i ERMU 12-12-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
12-12-2023
>
6.1i ERMU 12-12-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:44:06 AM
Creation date
12/8/2023 3:20:39 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Kerzman — Engineering Manager <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />December 12, 2023 <br />6.1i <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• We continue to work with City of Elk River IT staff on expansion of the fiber loop to the <br />northeast area of Elk River and have a project kickoff meeting with the contractor during <br />the week of December 11. <br />• We continue to work with DGR and WEG on design questions for the Otsego substation <br />transformer, and still expect full review drawings in January of 2024. <br />• We continue to work on the planning and design of the future East substation, which <br />will be needed to support development in the southeast portion of our service territory. <br />• We continue to assist with Advanced Metering Infrastructure system planning and setup <br />as the first meters are installed. <br />• We are expanding Multi Factor Authentication and have noticed an increase in spam <br />and phishing emails recently. <br />Page IofI <br />193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.