Laserfiche WebLink
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Sumstad — Electric Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />December 12, 2023 <br />6.1f <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Installed 17 new residential services, which involves the connection of a secondary line <br />once the customer requests service. <br />• The bore crew began replacing underground primary wire along 202nd Avenue in <br />northwest Elk River. This is part of the same wire replacement area they have been <br />working on along Rawlins Street, Pascal Drive, and 201St Avenue. <br />• Crews rerouted approximately 800 feet of three phase underground primary at the <br />landfill. The existing wire was in conflict with a building project planned there. <br />• We extended three phase underground primary 1500 feet east along 2251h Avenue and <br />north up Baldwin Street on the east side of Highway 169. This will serve the three phase <br />needs at the Martin Marietta gravel pit located on the north side of the wind turbine. <br />• Crews are currently working on installing the three phase service for the new Beaudry <br />storage facility located on the north side of our West substation along County Road 1. <br />• Minnesota Municipal Utilities Association (MMUA) Safety Trainer Joe Schmidt was here <br />on November 29 and held training on chemical safety and scissor lift operations for field <br />staff. <br />• Jay Reading from MMUA was here for a Job Training & Safety session on November 21. <br />This training was for our line crews and covered personal protective grounding. <br />• Carr's Tree Service returned on November 20 to continue their tree trimming. They will <br />be working in our service area until the end of March. <br />Page Iof2 <br />187 <br />