My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1f ERMU 12-12-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
12-12-2023
>
6.1f ERMU 12-12-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:43:48 AM
Creation date
12/8/2023 3:19:10 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br />Municipal Utilities UTILITIES COMMISSION MEETING <br />TO: <br />FROM: <br />ERMU Commission <br />Chris Sumstad — Electric Superintendent <br />MEETING DATE: <br />AGENDA ITEM NUMBER: <br />December 12, 2023 <br />6.1f <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />• Installed 17 new residential services, which involves the connection of a secondary line <br />once the customer requests service. <br />• The bore crew began replacing underground primary wire along 202nd Avenue in <br />northwest Elk River. This is part of the same wire replacement area they have been <br />working on along Rawlins Street, Pascal Drive, and 201St Avenue. <br />• Crews rerouted approximately 800 feet of three phase underground primary at the <br />landfill. The existing wire was in conflict with a building project planned there. <br />• We extended three phase underground primary 1500 feet east along 2251h Avenue and <br />north up Baldwin Street on the east side of Highway 169. This will serve the three phase <br />needs at the Martin Marietta gravel pit located on the north side of the wind turbine. <br />• Crews are currently working on installing the three phase service for the new Beaudry <br />storage facility located on the north side of our West substation along County Road 1. <br />• Minnesota Municipal Utilities Association (MMUA) Safety Trainer Joe Schmidt was here <br />on November 29 and held training on chemical safety and scissor lift operations for field <br />staff. <br />• Jay Reading from MMUA was here for a Job Training & Safety session on November 21. <br />This training was for our line crews and covered personal protective grounding. <br />• Carr's Tree Service returned on November 20 to continue their tree trimming. They will <br />be working in our service area until the end of March. <br />Page Iof2 <br />187 <br />
The URL can be used to link to this page
Your browser does not support the video tag.