My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2z2 ERMU 12-12-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
12-12-2023
>
5.2z2 ERMU 12-12-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:42:12 AM
Creation date
12/8/2023 3:07:06 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk <br />Municipal Utilities <br />MORATORIUM EFFECTIVE FEBRUARY 14, 2017 ON THE FOLLOWING LOAD CONTROL PROGRAMS <br />ENERGY MANAGEMENT PROGRAM RATES <br />Available: Within Elk River Municipal Utilities (ERMU) established service territory. <br />Applicable: To single family residences, non -demand and demand customers receiving service under <br />another rate, who add a second meter for any of the following controlled loads: <br />Dual Fuel Space Heating Rate: This Program is available to residential customers only. A dual fuel space <br />heating system consists of an electric heating system and a secondary non -electric space heating system <br />both capable of heating the living space at design conditions. Interruptions of the electric heating <br />system will usually occur for up to 12 hours daily on peak winter days and a maximum of 400 hours per <br />heating season. <br />To qualify for the special rate, the customer shall provide: <br />1. An electric space heating system which can be interrupted by a single 5 amp rated relay. <br />2. A secondary non -electric space heating system capable of automatic start-up and continuous <br />operation upon interruption of the electric heating system. <br />3. Obtain a load control device furnished by ERMU. <br />4. Accommodations for a meter and load control device and associated wiring installed according <br />to the applicable electrical codes, and installed by a qualified electrician. <br />5. Inspection by a State certified electrical inspector and a representative of ERMU. <br />6. Radiant heat in the slab of the building qualifies for dual fuel, not electric thermal storage. <br />7. Dual Fuel is not allowed in garages, pole sheds, or any structure that does not confirm to the <br />residential building code. <br />8. Exceptions by management approval only. <br />ERMU shall provide: <br />1. All electric energy consumed by the primary electric heating system at $0.0651 per kWh. <br />2. During peak load conditions, ERMU will turn customer controlled electrical heat off for extended <br />periods of time as stated above. <br />3. A meter to measure electricity consumed by the electric heating system. <br />4. A load control device and meter socket to accommodate the meter. <br />Rate is subject to application of Power Cost Adjustment (PCA). <br />Federal, state and local taxes may apply. <br />Page 1 of 3 <br />143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.