My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2t ERMU 12-12-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
12-12-2023
>
5.2t ERMU 12-12-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:41:29 AM
Creation date
12/8/2023 3:01:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demand Electric Service Rate <br />Minimum Bill: Maximum billing demand during previous twelve months times 3.0% of the demand <br />charge, or the actual demand multiplied by the demand charge, whichever is greater plus $1.00 per kW <br />per month of excess transformer capacity requested by customer. <br />Determination of Billing Demand: The billing demand shall be the highest measured demand (corrected <br />for power factor if required) during any fifteen (15) minute period occurring in the current billing period. <br />But in no month shall the billing demand be greater than the value in kW determined by dividing the <br />kWh sales for the billing month by 75 hours per month. This billing adjustment applies only if the <br />customer's peak demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m. <br />Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br />demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of <br />isolating the load from the balance of Elk River Municipal Utilities' system so that the load will not <br />unduly interfere with service on Elk River Municipal Utilities' lines. In addition, Customers who fail to <br />provide adequate corrective equipment shall be required to own and maintain their own transformers. <br />No motor larger than ten (10) HP (or 7.355 kW) will be allowed to be across -the -line started without <br />notification and written authorization from ERMU. <br />Power Factor Adjustment: For loads of 50 kW or more, or at the option of ERMU for loads of less than <br />50 kW, power factor adjustments may be made in the billing demand, when the power factor, as <br />determined by test, at the time of the Customer's maximum use is less than 98%. If the power factor, as <br />measured by ERMU's electric department, is lower than 98%, the monthly demand charge may be <br />multiplied by the ratio 98% divided by the measured power factor, or at ERMU's option, the power <br />factor may be corrected at the Customer's expense. <br />Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and <br />Delinquent Notices.) <br />Terms and Conditions: <br />1. Usage may be fractionalized on the actual days of service for application of a change in rate. <br />2. Service will be furnished pursuant to ERMU's rules. <br />3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules <br />governing Extension of Service and Facilities. <br />4. The rates set forth herein may be modified by the amount of any governmental changes <br />imposed and levied on transmission, distribution, production, or the sale of electrical power. <br />5. Exceptions by management approval only. <br />Adopted P@G@ ,;b@F 19, 'n" December 12, 2023 <br />Effective!@^H@r, ', 2024 January 1, 2024 <br />Page 2 of 2 <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.