My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2q ERMU 12-12-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
12-12-2023
>
5.2q ERMU 12-12-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 9:41:21 AM
Creation date
12/8/2023 2:59:53 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Non -Demand All Electric Service Rate <br />Federal, state, and local taxes may apply. <br />Minimum Bill: The Basic Monthly Electric Charge plus $1.00 per kW per month of excess transformer <br />capacity requested by customer. <br />In case of equipment having abnormally low annual utilization factors or unusual operating <br />characteristics, special minimum charges may be prescribed by ERMU. <br />Power Factor Adjustment: The rates set forth in this schedule are based on the maintenance by the <br />Customer of a power factor of not less than 98% at all times. If the power factor, as measured by the <br />electric department, is lower than 98%, the monthly demand charge may be multiplied by the ratio 98% <br />divided by the measured power factor, or at ERMU's option, the power factor may be corrected at the <br />Customer's expense. <br />Fluctuating Loads: Customers operating equipment having a highly fluctuating or large instantaneous <br />demand, such as welders and X-ray machines, shall be required to pay all non -betterment costs of <br />isolating the load from the balance of ERMU's lines. No motor larger than ten (10) HP (or 7.355 kW) will <br />be allowed to be across -the -line started without notification and written authorization from ERMU. In <br />addition, Customers who fail to provide adequate corrective equipment shall be required to own and <br />maintain their own transformers. <br />Billing and Terms of Payment: See ERMU Service Policies Policy (Billing Due Dates, and Penalties and <br />Delinquent Notices.) <br />Terms and Conditions: <br />1. Usage may be fractionalized on the actual days of service for application of a change in rate <br />or changing from summer to winter or from winter to summer rates. <br />2. Service will be furnished pursuant to ERMU's rules. <br />3. Extensions made for service under this schedule are subject to the provisions of ERMU's rules <br />governing Extension of Service and Facilities. <br />4. The rate set forth herein may be modified by the amount of any governmental changes <br />imposed and levied on transmission, distribution, production, or the sale of electrical power. <br />5. Exceptions by management approval only. <br />Adopted P@G@ ,;b@F 19, 'n" December 12, 2023 <br />Effective!@^H@r, ', 2024 January 1, 2024 <br />Page 2 of 2 <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.