Laserfiche WebLink
Elk River Municipal Utilities Business Plan/Budget <br />2024 Electric Department Capital Budget <br />Capital Construction <br />Projects <br />Cast Description <br />$ <br />100,000 Highway 169 redefine <br />$ <br />125,000 Rebuild Sandpiper Estates <br />$ <br />130,000 3 phase URD extension to Anna's Acres Development, Otsegc <br />$ <br />75,000 Rebuild: 202nd Ave <br />$ <br />150,000 Rebuild: 185th Ave <br />$ <br />100,000 Cty Rd 44 Rebuild <br />$ <br />100,000 Cty Rd 33 <br />$ <br />100,000 Otsego Street Lights <br />$ <br />100,000 Waco Business Center Dr Recon <br />Subtotal $ <br />980,000 *Projects listed in order of priority <br />Capital Construction <br />Substations <br />Cost Description <br />$ <br />1,150,000 East Design and Construction <br />Reserves <br />$ <br />12,000 North Recloser Controller Replacement <br />$ <br />370,840 Otsego Transformer Replacement <br />Reserves <br />$ <br />24,000 Otsego Recloser Controller Replacement <br />$ <br />12,000 Station 14-3 Recloser Controller Replacement <br />$ <br />60,000 Station 14-3 Recloser Tank Replacement <br />$ <br />12,000 Waco Bank #1 Recloser Controller Replacement <br />$ <br />6,000 Waco Bank N2 Recloser Controller Replacement <br />$ <br />25,000 West Bank #2 Recloser Tank Replacement <br />$ <br />77,000 Cap and Reg Controllers <br />$ <br />66,000 SCADA Network Upgrades <br />Subtotal $ <br />1,814,840 <br />Capital Construction <br />Feeders <br />Cost Description <br />$ <br />100,000 County Rd 35 Feeder to Wacc <br />Reserves <br />$ <br />250,000 Rebuild Feeder 46 Substation to Hwy 10 <br />$ <br />700,000 Data Center Feeder <br />Reserves <br />$ <br />25,000 Feeder 71/72 Replace 500 MCM from reclosure to rises <br />$ <br />750,000 Unidentified Feeders <br />Reserves <br />Subtotal $ <br />1,825,000 <br />Capital Construction <br />System <br />Cost Description <br />$ <br />500,000 Transformers and Meters <br />$ <br />3,125,000 AMI <br />Inter -Fund <br />$ <br />350,000 New Development Distribution Installation <br />$ <br />50,000 Street Lighting <br />$ <br />75,000 Ongoing OH Equip Replacement (Poles, Switches, Cut -Outs) <br />$ <br />150,000 Ongoing URD Equip Replacement (Switches, J-Boxes, Fuse Pads) <br />$ <br />75,000 Fault Indicators Replacements <br />Subtotal $ <br />4,325,000 <br />Capital Equipment Needs <br />Cost Description <br />$ <br />335,000 Replace Digger Truck Vehicle A9 <br />$ <br />65,000 Replace Truck Vehicle #13 <br />$ <br />10,000 Chipper Box <br />$ <br />43,000 Dump Trailer <br />$ <br />7,000 Salt Spreader <br />$ <br />- Shared Equipment <br />$ <br />96,650 Electric share of Administration <br />$ <br />329,900 Electric Share of Technical Services <br />$ <br />17,500 Tools at Field Services Building <br />Subtotal $ <br />904,050 <br />Capital Facilities & Misc Needs <br />Cost Description <br />$ <br />30,000 Vactron clean out west sub <br />$ <br />25,000 Concrete at FSB dumpsters/fuel station <br />$ <br />10,000 Oil dispensing system <br />$ <br />300,000 County Rd 12 Interconnection Agreement - Connexus <br />Reserves <br />$ <br />950,000 Territory Acquisition - Loss of Revenue Pmt (2015 Contract - Area 1&2, 3&4, 5&6, 7&8 <br />Reserves <br />Subtotal $ <br />1,315,000 <br />Total Capital $ 11,163,890 <br />Electric Noteworthy Non -Recurring Expenses <br />Cost Description <br />$ <br />6,050 Computers, iPads, Software, Accessories <br />$ <br />6,000 Paint Trailer <br />$ <br />- Paint Truck <br />$ <br />10,000 Tools <br />$ <br />15,000 West Bank #1 Contractor Testing and Inspections <br />$ <br />24,800 Electric share of Administration <br />$ <br />18,170 Electric share of Technical Services <br />Total $ <br />80,020 <br />110 <br />