Laserfiche WebLink
71 Friends of the Mississippi River Camp Cozy Park NRMP <br />Year Season Unit(s) Activity <br />Acres/ <br />Count <br />Cost/ <br />Ac Cost Est. <br />1 <br />After <br />October <br />10 Unit 1 <br />Conduct prescribed burn of northern 2/3 of prairie <br />allowing fire to run into north woodlands where <br />feasible. Avoid ignition of 0.5-acre poison ivy patch <br />or burn with head fire and avoid area until fire is <br />extinguished. <br />7 $1,210 $8,470 <br />1 Fall Unit 1 <br /> <br />Supplementally seed areas of woody removal. <br />Includes seed cost and broadcast seeding. <br />5 $1,250 $6,250 <br />1 Winter Units 1, 2 <br />Burn material cut during summer when snow cover <br />is present. 2 $750 $1,500 <br />Subtotal $37,145 <br /> <br />PHASE 2. REMNANT PRAIRIE MANAGEMENT <br />2 June Units 1, 2, 5, 7 Conduct breeding bird survey. 32 - $1,000 <br />2 August Units 1, 2 <br />Conduct rusty patched bumble bee survey in prairie <br />foraging habitat post burning 15.3 - $1,000 <br />2 <br />Before <br />April 10 Unit 2 <br />Establish mowed north to south firebreak dividing <br />unit in half. Conduct prescribed burn of western <br />half of prairie allowing fire to run into peripheral <br />woodlands where feasible. <br />3.3 $1,210 $3,993 <br />2 April Unit 2 <br />Supplementally seed areas of woody removal. <br />Includes seed cost and broadcast seeding. 2 $1,250 $2,500 <br />2 May Units 1, 2 <br />Spot spray smooth brome with sethoxydim or <br />another grass-specific herbicide. 1 $950 $950 <br />2 June Units 1, 2 Spot spray non-native thistles. 0.5 $950 $425 <br />Subtotal $9,868 <br /> <br />PHASE 3. WOODY INVASIVE SPECIES MANAGEMENT IN FORESTS AND WOODLANDS; PRAIRIE MAINTENANCE <br />3 June Units 1, 2, 5, 7 Conduct breeding bird survey. <br />32 - $1,000 <br />3 <br />After <br />October <br />10 Unit 1 <br />Conduct prescribed burn of southern 1/3 of prairie <br />unburnt in year 1, allowing fire to run into north <br />woodlands where feasible. <br />3 $1,210 $3,630 <br />3 <br />Fall- <br />Winter Units 5, 6, 7 <br />Hand cut and stump treat light density buckthorn <br />and other non-native invasive shrubs. Pile cut <br />material in woodland openings for winter burning. <br />Create no more than 3 piles per unit. <br />17 $2,500 $42,500 <br />3 <br />Fall- <br />Winter Units 5, 6, 7 Burn cut material when snow cover is present. <br />9 $750 $6,750 <br />3 <br />Fall- <br />Winter Units 5, 6, 7 <br />Forestry mow areas of dense buckthorn and other <br />non-native invasive shrubs. <br />12 $1,750 $21,000 <br />3 <br />Fall- <br />Winter Units 5, 6, 7 <br />Broadcast buckthorn replacement graminoid seed <br />in areas of woody removal. Acreage assumes half of <br />units have bare ground. Includes seed cost. <br />14 $750 $10,500