Laserfiche WebLink
Capital Improvement Plan 2024 rhru 2028 <br />City of Elk Diver, Minnesota <br />Project WW-31 <br />Project Name Head of Plant Splitter Structure <br />Department Sewer Department <br />Contact Public Works Director <br />Type Improvement <br />Useful Life 20 years <br />Category Utilities <br />Description <br />nstallation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions. <br />Justification <br />,urrently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The <br />addition of the splitter structure will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive <br />additional connections in the future (if NW or NW service area expansions ever are considered). <br />Expenditures 2024 <br />2025 2026 2027 <br />2028 Total <br />Construction/Maintenance <br />1,500,000 <br />1,500,000 <br />Total <br />Funding Sources 2024 <br />1,500,000 <br />2025 2026 2027 <br />1,500,000 <br />2028 Total <br />Sewer Fund <br />1,500,000 <br />1,500,000 <br />Tom <br />1,500,000 <br />1,500,000 <br />2024-2028 CAPITAL IMPROVEMENT PLAN <br />