My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 12-04-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
12-04-2023
>
4.5 SR 12-04-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 1:05:57 PM
Creation date
11/30/2023 4:08:58 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan 2024 rhru 2028 <br />City of Elk Diver, Minnesota <br />Project # FD-25 <br />Project Name Fire Equipment <br />Department <br />Fire <br />Contact <br />Fire Chief <br />Type <br />Equipment <br />Useful Life <br />10 years <br />Category <br />Equipment <br />Description I <br />extrication tools (Jaws of Life) - update two sets on front line apparatus. The purchase would include a spreader, cutter, and ram device along with <br />iecessary batteries, chargers, and modification to apparatus to propertly secure them. ($64,000) <br />Y4oveable wall maze system for training area in station 3. ($45,000) <br />Justification <br />]Ve have two sets of extrication tools that are 10+ years old on front line fire engines. In 2021 the department evaluated battery operated tools and <br />purchased one set for the rescue truck. These tools have been highly successful and proved their value in allowing quick deployment and reduced <br />maintenance. <br />Maze system was not included in station 3 construction due to lack of funds. <br />Expenditures 2024 <br />2025 2026 <br />2027 2028 Total <br />Equipment <br />109,000 <br />109,000 <br />Total <br />Funding Sources 2024 <br />109,000 <br />2025 2026 <br />109,000 <br />2027 2028 Total <br />Yet To Be Determined <br />109,000 <br />109,000 <br />Total <br />109,000 <br />109,000 <br />2024-2028 CAPITAL IMPROVEMENT PLAN <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.