My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.18 SR 11-20-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
11-20-2023
>
4.18 SR 11-20-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 11:50:58 AM
Creation date
11/17/2023 11:49:44 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brenteson Companies, Inc. 5/31/23 <br />DOCUMENT 00 41 00 <br />QUOTE FORM <br />BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS FOR THE FOLLOWING UNIT <br />PRICES AND/OR LUMP SUMS, WHICH INCLUDE SALES TAX AND OTHER APPLICABLE TAXES i4ND FEES. THE CITY <br />RESERVES THE RIGHT TO ADD OR ELIMINATE PARTIAL OR ENTIRE QUANTITIES OF INDIVIDUAL BID ITEMS. <br />ORONO PARK BEACH STABILIZATION IMPROVEMENTS <br />Item Unit Price Amount <br />No. Description Unit Est. Qty In Dollars In Dollars <br />1 Mobilization LS 1 1120.00 <br />Furnish and install 12" compacted <br />2 depth topsoil borrow — complete. CY 58 90 80 5.266.40 <br />Furnish and install infiltration pipe <br />including 24" dia. Perforated HDPE <br />3 pipe, fabric, 2" minus river rock LF 75 <br />bedding, and compacted backfill <br />material as shown on the plans and <br />details - com lete. 83.85 6,288.75 <br />4 Furnish and install manhole with 24" EA 1 <br />sump - complete. 6 772.50 <br />5 Furnish and install 6" thick concrete SF 84 <br />avin - com lete. 31.76 2 7. 4 <br />6 Furnish and install 6" x 18" concrete LF 41 <br />curb - com lete. 88.25 <br />7 Furnish and install sod - complete. SY 145 40.45 <br />Furnish and install irrigation zone <br />8 within sodded area, included LS 1 <br />connection to existin s stem. 8 220.00 <br />Quote Total 39,818.99 <br />Quote Form <br />00 4100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.