Laserfiche WebLink
,����,�������� <br />�a � I��.�������������� . , <br />19512 HUBBLE ROAD <br />CLEARWATER, MN 55320 <br />CONTRACTOR #: BC631037 <br />GENERAL CONTRACTOR: <br />City of Elk River � ~ <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />DAN DUGGAN <br />(320) 330-�$44 <br />dan@jklandscape.com <br />INV[�ICE <br />PROJECT ID: DATf <br />2023-0272 � 11/10/2023 <br />_ _____f � <br />DESCRfPTION <br />PROJECT ID 2023-0272 � v <br />2.YEAR WARRANTY AND MAINTENANCE, INCLUDE - <br />$10,000.00 <br />BEGINNING INVOICE / ESTIMATE #:6309 BALANCE _ <br />$272,652.60 <br />Mobilization (Lump Sum) <br />Maint. & Restoration of Haul Roads (Lump Sum) <br />Clearing and Grubbing (Lump Sum) <br />Excavation-Common {CY) <br />Common Embankment (CY) <br />Floating Silt Curtain Type Moving Water (LF) <br />Subsoiling (AC) <br />Soil Bed Prep (AC) <br />Seed Mixture 21-111(LBS) <br />Seed Mixture 35-221(LBS) <br />Mowing (AC) <br />Weed Spraying (AC) <br />Weed 5pray Mixture (GAL) <br />Rolled Erosion Prevention Category 25 (SY) <br />Seeding (AC) - **34,848 sq ft** <br />Toewood Bench (LF) <br />PERMIT FEES: MPCA Confirm #:MNPPCA000083253 <br />Pmt Amt:$40U + Service Fee:$8.60 = Total:$408.60 <br />MN Pollution Control Agency <br />Confirmation Number: MNPPCA000083253 <br />Payment Amount: $400.00 <br />Service Fee: $8.60 <br />Total Amount: $408.60 <br />�-�� -���,~-��� <br />��� ��- � <br />Qnr <br />0 <br />0 <br />0 <br />1 <br />1 <br />1 <br />8,091 <br />2,061 <br />273 <br />0.8 <br />0.8 <br />80 <br />30 <br />2 <br />0.5 <br />0.5 <br />3,874 <br />0.8 <br />1,21Q <br />1 <br />0 <br />Page <br />I PROJECT ADDRE55: <br />� -- - -- - - - �--- - � - -- - <br />CITY OF ELK RIVER <br />HOULTON CONSERVATION AREA <br />BANK PROTECTION <br />MISSISSIPPI SITE <br />Elk River, MN 55330 <br />� RATE AMOUNT TOTAL %COMPLETfD TOTAL $ DUE <br />15,000.0C <br />9,250.0C <br />1,500.0C <br />7.7� <br />7.7� <br />35.OL <br />2,500.00 <br />2,500.00 <br />3.00 <br />40.OG <br />500.OQ <br />600.00 <br />100.00 <br />4.00 <br />4,500.00 <br />82.50 <br />408.60 <br />15,000.00 <br />9,250.00 <br />1,500.00 <br />62,705.25 <br />15,972.75 <br />9,555.00 <br />2,000.00 <br />2,U00.00 <br />240.00 <br />1,200.00 <br />1,000.00 <br />300.00 <br />50.00 <br />15,496.00 <br />3,600.00 <br />91,575.00 <br />408.60 <br />100.009'0 <br />100.00 % <br />100.00% <br />100.00% <br />100.00� <br />100.00% <br />100.009� <br />100.00 % <br />100.00� <br />100.00% <br />100.00% <br />1U0.00% <br />100.009� <br />100.00% <br />100.00% <br />10U.00� <br />100.009� <br />0.00 <br />0.00 <br />0.00 <br />15,000.00 <br />9,250.00 <br />1,500.00 <br />62,705.25 <br />15,972.75 <br />9,555.00 <br />2,000.00 <br />2,000.00 <br />240.00 <br />1,200.00 <br />1,000.00 <br />300.00 <br />50.00 <br />15,496.00 <br />3,600.00 <br />91,575.00 <br />408.60 <br />0.00 <br />TOTAL ESTIMATE: � $ 272,652.60 <br />PAYMENTS / CREDIT: - $268,073.85 <br />FINAL BALANCE DUE: $ 4,578.75 <br />