My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.01h ERMUSR 11-14-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2023
>
11-14-2023
>
6.01h ERMUSR 11-14-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:19:47 PM
Creation date
11/13/2023 2:03:16 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We have drained the Auburn Street Water Tower for the winter. Throughout previous <br />winters the tower was subject to ice buildup on top of the water, which is extremely <br />damaging to the structure and paint. This will be the last time we will need to drain the <br />tower for winter as we have identified in the 2024 budget to have a submersible tank <br />mixer installed to keep the water moving, preventing freezing and improving water <br />quality. <br />ATTACHMENTS: <br />• October 2023 Pumping by Well <br />Page 2 of 2 <br />Um <br />
The URL can be used to link to this page
Your browser does not support the video tag.