Laserfiche WebLink
We have drained the Auburn Street Water Tower for the winter. Throughout previous <br />winters the tower was subject to ice buildup on top of the water, which is extremely <br />damaging to the structure and paint. This will be the last time we will need to drain the <br />tower for winter as we have identified in the 2024 budget to have a submersible tank <br />mixer installed to keep the water moving, preventing freezing and improving water <br />quality. <br />ATTACHMENTS: <br />• October 2023 Pumping by Well <br />Page 2 of 2 <br />Um <br />