Laserfiche WebLink
Elk River Municipal Utilities <br />Proposed 2024 Utilities Fee Schedule <br />Fee Description <br />ELECTRIC <br />2023 <br />Proposed <br />2024 <br />Proposed <br />Increase <br />New Residential Electric Connection - Developer - Lot with ERMU water service <br />$ 975.00 <br />$ 975.00 <br />New Residential Electric Connection - Developer - Lot without ERMU water service <br />$ 1,075.00 <br />$ 1,475.00 <br />New Electric Connection <br />$ 875.00 <br />$ 875.00 <br />New Wire Footages over 200' (per foot) <br />$ 4.00 <br />$ 5.00 <br />New Service Frost Trenching (per foot) <br />$ 5.00 <br />$ 6.00 <br />New Commercial & Industrial Electric Connection <br />50% <br />50% <br />Service Upgrades or Additions for Existing Customers <br />100% <br />100% <br />Minimum Temporary Electric Service Fee - Existing Transformer <br />$ 220.00 <br />$ 220.00 <br />Minimum Temporary Electric Service Fee - Without Existing Transformer <br />$ 850.00 <br />$ 850.00 <br />Grid Access Fee - new <br />New <br />Street Light - 30' Decorative Pole with 6' Arm and Cobra Fixture <br />$ 2,700.00 <br />$ 2,700.00 <br />Street Light - 23' Decorative Pole with Cobra Fixture <br />$ 1,800.00 <br />$ 1,800.00 <br />Street Light - 14' Decorative Pole with Cobra Fixture <br />$ 4,100.00 <br />$ 4,100.00 <br />Street Light - 14' Decorative Pole with Acorn Fixture <br />$ 5,300.00 <br />$ 5,300.00 <br />Security Light - Wood Pole with Fixture <br />$ 975.00 <br />$ 975.00 <br />Security Light - Existing Pole <br />$ 350.00 <br />$ 350.00 <br />Pole Attachment Fee (per pole) Chris K to update agreement to include late fees <br />$ 15.00 <br />$ 15.00 <br />Meter Installation Fee (per individually metered apartment unit) <br />$ 22.00 <br />$ 22.00 <br />WATER <br />Water Access Charge = Water Connection Charge + Water Availability Charge <br />$ 3,990.00 <br />$ 3,990.00 <br />Water Connection Charge (Per Plumbing Unit) - Builder <br />$ 3,600.00 <br />$ 3,600.00 <br />Water Availability Charge (Per Plumbing Unit) - Developer <br />$ 390.00 <br />$ 390.00 <br />Abandoned Water Service (minimum) <br />$ 6,000.00 <br />$ 6,000.00 <br />Backflow Preventer Device Non -Compliance (per month) <br />$100.00 <br />$ 100.00 <br />Deposit for 5/8" Hydrant Meter <br />$ 150.00 <br />$ 150.00 <br />Deposit for 2 1/2" Hydrant Meter <br />$ 1,000.00 <br />$ 1,000.00 <br />Hydrant Water Sales - Rental (per week) <br />$ 50.00 <br />$ 50.00 <br />Hydrant Water Sales - Units (per 1000 gallons) <br />$ 4.00 <br />$ 4.00 <br />Hydrant Wrench <br />$ 40.00 <br />$ 40.00 <br />Private Hydrant Maintenance Program Monthly Fee <br />$ 5.00 <br />$ 5.00 <br />ADMINISTRATIVE <br />Administrative Fee for Continued Submission of Checks After No -Check Notice Given <br />$ 20.00 <br />$ 20.00 <br />Administrative Fee for Continued Submission of Payment After Account Closed - new <br />$ 20.00 <br />New <br />Billable Cost of Materials Markup <br />15% <br />15% <br />Billable Labor Markup <br />55% <br />55% <br />Billable Vehicle / Equipment (per employee per hour) <br />$ 45.00 <br />$ 45.00 <br />Commercial Application Fee <br />$ 20.00 <br />$ 20.00 <br />Electric Service Disconnect/Trip Fee - Meter Technician <br />$ 50.00 <br />$ 50.00 <br />Electric Service Disconnect/Trip Fee - Line Crew <br />$ 150.00 <br />$ 150.00 <br />Water Service Disconnect/Trip Fee - Water Operator <br />$ 100.00 <br />$ 100.00 <br />Manual Meter Reading Fee (per month) <br />$ 10.00 <br />$ 50.00 <br />Additional Manual Meter Reading Fee (per month) -new <br />$ 10.00 <br />New <br />Meter Tampering Fee <br />$ 250.00 <br />$ 250.00 <br />Meter Testing Fee <br />$ 50.00 <br />$ 50.00 <br />NSF Fee <br />$ 30.00 <br />$ 30.00 <br />Penalty Amount <br />10% <br />10% <br />Photocopies(per page) <br />$ 0.25 <br />$ 0.25 <br />Red Tag Handling Fee <br />$ 20.00 <br />$ 20.00 <br />93 <br />