My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.3 SR 11-06-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
11-06-2023
>
11.3 SR 11-06-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2023 9:43:34 AM
Creation date
11/3/2023 9:41:37 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/6/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />2024 thru 202� <br />Project # ww-31 <br />rro�e�tName Head of Plant Splitter Structure <br />Department Sewer Department <br />Contact Public Works Director <br />Type Improvement <br />Useful Life 20 years <br />Category Utilities <br />l�escription I <br />nstallation of splitter structure before the headworks building so influent can be isolated and managed at atmospheric pressure conditions. <br />Justification I <br />,urrently the wastewater treatment facility is fed with three main lift stations that force (under pressure) flow into the headworks building. The <br />�ddition of the splitter structure will allow the influent to gravity feed the plant giving far more operational control and ability to expand to receive <br />�dditional connections in the future (if NW or NW service area expansions ever are considered). <br />Expenditures 2024 2025 2026 2027 2028 Total <br />Construction/Maintenance 1,500,000 1,500,000 <br />TOt�l 1,500,000 1,500,000 <br />Funding Sources 2024 2025 2026 2027 2028 Total <br />Sewer Fund 1,500,000 1,500,000 <br />'j'p�j 1,500,000 1,500,000 <br />2023-2027 CAPITAL IMPROVEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.