Laserfiche WebLink
East Fiber Extension <br /> Elk River, Minnesota <br /> <br />S-10 Project Storage Area <br />The City will provide material storage at the City Garage, 19000 Proctor Road. The <br />Contractor may choose to locate his own storage area and acquire permission from the appropriate <br />parties to store equipment and materials. The Contractor shall be responsible for restoring the <br />storage area back to its original condition. <br />S-11 Traffic Control <br />All traffic control devices (construction signs, barricades and barricade weights, <br />flaggers, warning lights, cones, drums, trailers, pavement markings, flagmen, etc.) shall conform and <br />be installed in accordance to the "Minnesota Manual on Uniform Traffic Control Devices" <br />(MMUTCD) and Part VI, "Field Manual for Temporary Traffic Control Zone Layouts", the "Guide <br />to Establishing Speed Limits in Highway Work Zones", the Minnesota Flagging Handbook, the <br />provisions of Mn/DOT 1404 and 1710, the Minnesota Standard Signs Manuals Parts I and II, the <br />Traffic Engineering Manual, the Traffic Control Layouts/Typical Traffic Control Layouts in the <br />Plans, and these Special Provisions. <br />At the time of initial set up and at the time of major stage changes, 100 percent of <br />each type of device shall be classified as acceptable. The acceptable devices shall be determined by <br />using the guidelines set in the Temporary Traffic Control Zone Layout Field Manual. During the <br />duration of the project, the acceptable devices may decrease to 75 percent with 25 percent of the <br />devices marginal. Furnishing, installing, maintaining, relocating, and subsequently removing traffic <br />control devices as required will be considered incidental to the project. <br />S-12 Inspection Of Work <br />The City of Elk River will provide Observation of the work. City, County, or State <br />agencies having jurisdiction as deemed necessary by those authorities, may make additional <br />observation of the work. <br />S-13 Mobilization <br />Mobilization is considered incidental and should be considered in the bids of <br />individual items. <br /> <br /> End of Section <br /> <br />Division S S-3 <br /> <br />