My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.10 SR 10-16-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
10-16-2023
>
4.10 SR 10-16-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 10:10:11 AM
Creation date
10/13/2023 8:38:52 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/16/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Fiber Extension <br /> Elk River, Minnesota <br /> <br />Division S <br />S-1PROJECT DESCRIPTION <br /> <br />This project aims to provide city fiber infrastructure to the east side of Highway 169 <br />for current and future facilities. <br /> <br />S-2 Personnel <br /> <br />S-2.1 Owner <br />The Owner of the projects, entitled East Fiber Extension, is the City of Elk River. <br />Correspondence should be addressed to: <br /> <br />Mr. Justin Femrite, P.E. <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />Phone: 763.635.1051 <br />Email: jfemrite@ElkRiverMN.gov <br />S-3 Project Schedule <br />Construction of the East Fiber Extensionwill be as follows: <br /> Shall be completed before October 1, 2024. <br /> Once work has begun on the contract, it shall progress continuously and be <br />completed within one month of the start date. <br /> <br />Within ten (10) days of executing the Contract, and in any case by the time of the <br />preconstruction conference, the Contractor shall submit a schedule for commencement and <br />completion of the work. This schedule shall include an anticipated partial pay estimate schedule and <br />shall be reviewed by the Owner and the Engineer. The project schedule shall be updated by the <br />Contractor upon request of the Engineer. <br /> <br />S-4 Guarantee <br /> <br />The Contractor shall guarantee all materials and equipment furnished and work <br />performed for a period of two (2) years from the date of substantial completion. The Contractor <br />warrants and guarantees for a period of two(2) yearsfrom the date of substantial completion of the <br />system, that the completed system is free from all defects due to faulty materials or workmanship, <br />and the Contractor shall promptly make such corrections as may be necessary by reason of such <br />defects including the repairs, adjustments, or other work that may be necessary by such defects. In <br />the event that the Contractor should fail to make such repairs, adjustments, or other work that may <br />be necessary by such defects, the Owner may do so and charge the Contractor the cost thereby <br />Division S S-1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.