My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 ERMUSR 10-10-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2023
>
10-10-2023
>
6.1 ERMUSR 10-10-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2023 4:17:12 PM
Creation date
10/6/2023 4:13:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />October 10, 20236.1h <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Delivered 15new water meters, sealed the meter,installed an encoder receiver <br />transmitter, and took curb stop ties. <br />Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> Completed 20 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br /> SubmittedDischarge Monitoring Report for the Diesel Generation Plant to the <br />Minnesota Pollution Control Agency. <br /> The pump and motor for Well #7 have been removed and are being evaluated for what <br />repairs need to be done or if replacement is needed. <br /> Mixing equipment installation and maintenance work has been completed at Freeport <br />Water Tower. The tower has been refilled with water and can go back into service after <br />bacteria sampling and testing has been completed. <br /> Advanced Metering Infrastructure (AMI) meter reading equipment has been installed on <br />three water towers as planned. Staff is working with the vender to get the equipment <br />up and running. <br /> Some of the new water meters have arrived for the AMI meter reading system. We plan <br />to start delivering these new meters for installation in new home construction. <br /> Water department staff have been working with the contactors for the Highway 169 <br />Redefine and the School View neighborhood projects on performing water main <br />shutdowns for connection of new water main pipe. <br /> <br /> <br />ATTACHMENTS: <br /> September 2023 Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.