Laserfiche WebLink
4 Recommendations from EMS% Saved8%15%19%Total Usage12,352 2,690,000 $ 295,960 215.05 926 416,381 $ 55,560 $ 163,270 $ 76,800 16 Rink Supply Pumpsoperate all of pumps at the same timeAdd <br /> drives on the Discharge Pumps (5 HP) and 3 5 12.43 9,259 $ 1,019 $ 3,000 2.94 15 Hot Water Circulating Pumpsjust one at full load.Run both 15 HP HW pumps as the same time vs <br /> 2 15 45,745 $ 5,033 $ 6,000 1.19 14 Unit Heater Back Roomactually 74 F on eh ceiling and no one was in the Turn down the temperature from 70 F to 60 . It was 62 $ 632 <br /> -$ -13 Field House Controlsthe walking trackAdd controls to the outside lights to only operate for 60 9 42,094 $ 4,631 $ 2,000 0.43 12 Lights in Water Softener AreaInstall <br /> LED tubes to replace T8 Fluorescent Lights 4 0.09 1,760 $ 194 $ 20 0.10 11 Rink Supply Pumpsonly on2 -Operate all three pumps at the same time vs 13 20 48.65 97,240 <br /> $ 10,699 $ 1,000 0.09 10 Insulate PipingInsulate Hot Water Piping618 $ 6,324 $ 1,000 0.16 9 Drinking FountainsInstall Timers on Drinking Fountains12 6.00 13,140 $ <br /> 1,446 $ 100 0.07 8 Pop Machine Occupancy SensorAdd Occupancy Sensors2 0.84 1,840 $ 202 $ 150 0.74 7 TransformerEnergy Efficient Transformer1 5.00 43,800 $ <br /> 4,819 $ 15,000 3.11 6 SolarConsidering 40 kW solar (IRA Grant)1 40.00 52,560 $ 6,046 $ 128,000 $ 76,800 8.47 5 Hot Water Tanktank to a instant gas unit for Janitors area onlyConvert <br /> Upper level bathroom 73 kW hot water 1 73.00 39,968 $ 4,397 $ 1,000 0.23 4 Lighting Upgradeto 10 W)Replace all LED lights with new LED Lights (18 W 1500 12.00 58,464 $ 6,432 <br /> $ 6,000 0.93 3 Locker Roomstodays temp of 72 FSet back temperature in locker rooms to 65 F vs 17$ 2,530 -$ 2 Score Board LightsTurn off Score Board lights when not <br /> needed80 1.20 2,628 $ 289 -1 Lights on The Ice SheetsTurn off lights when not in use (3 h/d)80 7.20 7,884 $ 867 -$ Item #EquipmentECMQtyHP kW Dth kWh/Dth <br /> $ Rebate Payback Savings FEASIBLE$21,512.79 <br />