My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7 SR 09-18-2023
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2023
>
09-18-2023
>
4.7 SR 09-18-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2023 2:09:15 PM
Creation date
9/14/2023 2:08:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />To Item Number <br />Ma Tor and CinT Council 4.7 <br />Agenda Section Meeting Date Prepared by <br />Consent September 18, 2023 Ryan SandhoefneY P.E., EngineeY 1 <br />Item Description Reviewed by <br />Remove Crosswalk at School Street and Irving ustin Femrite P.E., Public Works Director <br />Avenue Reviewed by <br />Cal Portner, Ci r Administrator <br />Action Requested <br />Approve, by motion, the removal of the Rectangular Rapid Flashing Beacon (RRFB) system and associated <br />cross��alk across School Street at Irving Avenue. <br />Background/Discussion <br />On behalf of ISD #728, CoordinatoY of Prevention Nicole Stottlemyre has formallyr Yequested removal of this <br />crosswalk to reduce the number of cYossing points at uncontrolled intersections. ISD #728 officials propose <br />diverting all student walkers to the t�vo controlled cYosswalks located at Jackson and FYeeport, as well as the <br />remaining mid-block cross`valk located in front of Parker ElementaryT. The e�stence of the cross`valk and RRFB <br />syTstem was originally intended to support the front entrance of Lincoln elementaryT school. As stated in the attached <br />letter, renovations to the school this summer moved the entrance to the west side along Jackson Avenue. <br />If approved, the solar RRFB would be salvaged and inventoried for future use. Staff supports the proposed route <br />consolidation and removal of this crosswalk at an uncontrolled location of School Street. <br />Financial Impact <br />The main removals of the cross�valk elements `vill be accomplished by city staf£ The removal of the paint markings <br />`vould be from an outside contractor and be at a cost of $2,300. This amount can be covered `vithin the approved <br />Streets opeYating budget. <br />Mission/Policy/Goal <br />Meet changing needs - Agile <br />Attachments <br />Letter from ISD #728 <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Up�iited.• August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.