Laserfiche WebLink
<br />______________________________________________________________________________ <br /> <br />Page 2 of 2 <br />• The initial report from our annual leak detection survey showed 25 suspected leaks in <br />the distribution system. The water operators have been working with a company to <br />identify the source of the potential leaks. <br /> <br />• We have requested proposals for the installation of a tank mixer and to perform <br />maintenance work needed at Freeport Street Water Tower. The cost for this work is <br />identified in the water department capital budget. <br /> <br />• The water operators have also been exercising and repairing distribution system gate <br />valves as part of the annual gate valve exercising program. <br /> <br /> <br />ATTACHMENTS: <br />• July 2023 Pumping by Well <br />101