Change Order No. 2 <br />Date of Issuance: August 2, 2023 <br />Owner: City of Elk River <br />Contractor: North Valley, Inc. <br />Engineer: Bolton & Menk, Inc. <br />Project: 2023 Street Improvements Project <br />The Contract is modified as follows upon execution of this Change Order: <br />The existing storm sewer pipe in Morton Avenue south of the connection point of the proposed storm sewer <br />improvements was found to be 12-inch diameter. The record drawings in this location show this pipe as an 18-inch pipe. <br />The Morton Avenue Drainage Study completed in September 2022 determined the recommended improvement based <br />on the 18-inch pipe size. Updating the model to the smaller pipe size found that the storm water would surge out of the <br />new manhole on high rain events. To correct this surge, the 12-inch pipe needs to be replaced with the 18-inch pipe that <br />was originally believed to be in place. <br />The following pay items will be added to the contract: <br />Item No Description <br />CO-2.1 Remove 12" Storm Pipe <br />CO-2.2 18" RCP Storm Pipe <br />CO-2.3 Connect to Ex MH <br />CO-2.4 Bituminous Street Patch <br />CO-2.5 Remove & Replace Curb & Gutter <br />CO-2.6 Mobilization <br />CO-2.7 Traffic Control <br />CO-2.8 Grated Casting Lid <br />CO-2.9 Clear & Grub Tree <br />CO-2.10 R-3501-TB Casting Assembly <br />Quantity <br />271 LF <br />271 LF <br />2 EA <br />400 SY <br />20 LF <br />1 LS <br />1 LS <br />1 EA <br />4 EA <br />2 EA <br />Effective Date: August 7, 2023 <br />Owner's Contract No.: <br />Contractor's Project No.: <br />Engineer's Project No.: OR1.128082 <br />Contract Name: <br />Unit Price <br />$23.00 <br />$96.00 <br />$4,025.00 <br />$31.33 <br />$35.13 <br />$9,125.00 <br />$450.00 <br />$397.35 <br />$675.00 <br />$512.00 <br />Item Value <br />$6,233.00 <br />$26,016.00 <br />$8,050.00 <br />$12,532.00 <br />$702.60 <br />$9,125.00 <br />$450.00 <br />$397.35 <br />$2,700.00 <br />$1,024.00 <br />CHANGE IN CONTRACT PRICE <br />Original Contract Price: <br />$ 5,433,358.71 <br />CHANGE IN CONTRACT TIMES <br />Original Contract Times: <br />Substantial Completion: _November 3, 2023 <br />Ready for Final Payment: December 15, 2023 <br />Increase from previously approved Change Order No. 1: <br />$ 8,483.45 <br />Contract Price prior to this Change Order: <br />$ 5,441,842.16 <br />Increase of this Change Order: <br />�� <br />. <br />[Increase] [Decrease] from previously approved Change <br />Orders No. to No. <br />Substantial Completion: <br />Ready for Final Payment: <br />Contract Times prior to this Change Order: <br />Substantial Completion: <br />Ready for Final Payment: <br />Contract Price incorporating this Change Order <br />$— <br />By: <br />Title: <br />Date: <br />RECOMMENDED: <br />Engineer (if required) <br />Contract Times with all approved Change Orders: <br />Substantial Completion: November 3, 2023 <br />Readv for Final Pavment: December 15, 2023 <br />ACCEPTED: <br />By: <br />Owner (Authorized Signature) <br />Title: <br />Date: <br />[Increase] [Decrease] of this Change Order: <br />Substantial Completion: <br />Ready for Final Payment: <br />ACCEPTED: <br />By: <br />Contractor (Authorized Signature) <br />Title: <br />Date: <br />