Laserfiche WebLink
UPAABB1122N.I.C.N.I.C.D.05D.02D.01D.01D.02D.01TYPD.04TYPD.04D.02D.01D.02D.01D.02D.01TYPD.04D.02D.02D.01D.02D.01D.02D.01D.02D.01D.02D.01D.02TYPD.06R.01D.07D.08UPRAMPTYPD.04R.01R.02AREA 'A'AREA 'B'D.09D.098' - 0"PRODUCTION /WAREHOUSEOFFICEOFFICESTAGEMERCHSEATINGCOOLERCOOLERBARFIRE CONTROL /ROOF ACCESSSTORAGEENTRYOFFICEOFFICEUTILITYCLOSETOFFICEOFFICEOFFICEOFFICEOFFICERSTRM.RSTRM.RSTRM.RSTRM.RSTRM.1' - 6"3' - 0"1' - 6"3' - 0"AABB11228' - 0"STORAGE112ENTRY115STORAGE110PROD.111HALLWAY105PUB SIT.101R.01ADA RR107RR108RR109HALLWAY103BAR AREA102ENTRY1002.05UP2.06RAMPN.I.C.N.I.C.R.012.07R.02STORAGE113STORAGE114STORAGE118RR117RR116UTILITY119EVENT SPACEAREA 'A'AREA 'B'SOUND STAGESOUNDSTAGE3' - 0"3' - 0"2.092.052.052.042.034' - 6"2.062.10COOLER106COOLER104VERIFY W/ OWNER8' - 0"4' - 6"2.112.112.112.112.092.09SCALE: 1/8" = 1'-0"A101MAIN FLOOR PLAN2SCALE: 1/8" = 1'-0"A101MAIN FLOOR DEMOLITION PLAN1A R C H I T E C T SProject No:Project Manager:Drawn By:Date:These drawings and specifications arethe sole property of HMA Architects, Ltd.any reproduction or reuse of thesedocuments is forbidden without writtenpermission from HMA Architects, Ltd.Tim Gillet51031Signature:Printed Name:License No.:Date:I hereby certify that this plan, specificationor report was prepared by me or undermy direct supervision & that I am a dulyLicensed Architect under the laws of theState of Minnesota700 W. St. Germain StreetSuite 200St. Cloud, MN 56301www.hma-archs.comT | 320.251.9155F | 320.251.4919hma@hma-archs.comPERMIT SETFLOOR PLANSA101ELK RIVER, MNAEGIR BREWINGCO.BUILDING REMODEL:2320DASTL05/26/202305/26/2023A. CONTACT ARCHITECT IMMEDIATELY IF DISCREPANCIES ARE FOUND BETWEEN THE ARCHITECTURAL, AND EXISTING CONDITIONS.B. ALL TRADES TO COORDINATE WORK WITH OTHER TRADES TO MINIMIZE CONFLICTS DURING CONSTRUCTION. C. BLOCKING TO BE PROVIDED IN WALLS RECEIVING WALL MOUNTED FIXTURES, EQUIPMENT, HANDRAILS OR ACCESSORIES WHETHER BLOCKING IS IDENTIFIED OR NOT ON THE ARCHITECTURAL DRAWINGS.D. ALL WALLS TO BE CONSTRUCTED TO THE DECK ABOVE UNLESS NOTED OTHERWISE. DEFLECTION HEADS ARE REQUIRED AND GYP BD ASSEMBLIES WILL NEED TO ALLOW FOR ROOF DECK MOVEMENT. DO NOT CONSTRUCT GYP. BD. TIGHT TO DECK.E. ALL EXISTING FIRE EXTINGUISHER LOCATIONS TO BE VERIFIED AND REVIEWED BY THE FIRE MARSHALL PRIOR TO INSTALLATION.F. CONTROL JOINTS ARE TO BE PROVIDED IN GYPSUM BOARD ASSEMBLIES AS STATED BY THE GSA GUIDELINES.G. ALL TRADES WORKING IN EXPOSED CEILING AREAS WITH VISIBLE DUCTWORK, PIPING, AND LIGHTING WILL NEED TO COORDINATE LAYOUTS WITH EACH OTHER AND WITH OWNER’S APPROVAL PRIOR TO INSTALLATION. H. ARCHITECT IS NOT RESPONSIBLE TO DO QUANTITY TAKE OFFS FOR BIDDING RESPONSIBILITY. CONTRACTORS BIDDING THE PROJECTS ARE TO BECOME FAMILIAR WITH THE DRAWINGS AND BID PACKAGE THEY ARE RESPONSIBLE FOR. FLOOR PLAN GENERAL NOTES:A. VERIFY ALL EXISTING ROOM FINISH CONDITIONS BEFORE COMMENCING DEMOLITION, AND COORDINATE W/ WORK INDICATED IN THE DRAWINGS. REMOVE ALL EXISTING FINISHES, ADHESIVES, RESIDUE AND CONTAMINANTS THAT WILL INHIBIT PROPER INSTALLATION OF NEW CONSTRUCTION.B. EACH CONTRACTOR OR SUBCONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, AND FIXTURES AS REQUIRED FOR THE NEW CONSTRUCTION AS IDENTIFIED. ITEMS NOTED FOR SALVAGE AND REUSE SHALL BE CLEANLY REMOVED. THE OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON ALL OTHER ITEMS. ALL OTHER DEMOLITION ITEMS NOT TO BE RETAINED BY THE OWNER ARE TO BE REMOVED AND DISPOSED OF BY THE CONTRACTOR AS REQUIRED.C. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL EXISTING CONDITIONS FOR WORK THAT IS REQUIRED BY THEIR OWN TRADE. FOR EXAMPLE: THE PLUMBING CONTRACTOR WHO MUST CUT THE EXISTING FLOOR SLAB FOR INSTALLATION OF NEW PLUMBING SHALL ALSO BE RESPONSIBLE FOR PATCHING THE FLOOR AS REQUIRED.D. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHORING AND BRACING FOR THEIR WORK WHICH AFFECTS EXISTING STRUCTURAL SYSTEMS. IF ANY UNFORESEEN OR QUESTIONABLE STRUCTURAL CONDITIONS ARE ENCOUNTERED, IT SHALL BE THAT CONTRACTORS RESPONSIBILITY TO CONTACT THE ARCHITECT/ ENGINEER.E. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR VISITING THE SITE AND BECOMING FAMILIAR WITH ALL EXISTING CONDITIONS AND REQUIREMENTS OF THE CONTRACT. THE ARCHITECT HAS MADE A REASONABLE ATTEMPT TO INDICATE EXISTING CONDITIONS AND THE REQUIREMENTS FOR DEMOLITION. ANY CONTRACTORS ENCOUNTERING CONDITIONS DIFFERENT THAN INDICATED ON THE DRAWINGS SHALL NOTIFY THE G.C. BEFORE SUBMITTING BIDS.F. EACH CONTRACTOR SHALL BECOME FAMILIAR WITH THE REQUIREMENTS OF OTHER TRADE'S DEMOLITION WORK AND BE PREPARED TO COORDINATE WORK AND ACCESS SCHEDULES AS REQUIRED.G. EACH CONTRACTOR SHALL BE REQUIRED TO COORDINATE DEMOLITION, REMOVAL AND RELOCATION REQUIREMENTS AND SCHEDULES WITH THE OWNER / G.C. BEFORE PROCEEDING WITH THE WORK.H. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING OR REPLACING ANY ITEMS OR EXISTING CONDITIONS WHICH ARE TO REMAIN THAT HAVE BEEN DAMAGED DURING DEMOLITION PROCEDURES BY SAID CONTRACTOR. AN INVENTORY OF CONDITIONS OF MATERIALS TO REMAIN OR TO BE TURNED OVER TO THE OWNER SHALL BE CONDUCTED BY THE OWNER / G.C. BEFORE DEMOLITION WORK PROCEEDS.I. ALL CONTRACTORS SHALL EMPLOY PERSONS SKILLED IN THE SPECIFIC TRADE FOR PATCHING WORK TO BE DONE UPON REMOVAL OF RESPECTIVE ITEMS.J. THESE DRAWINGS DEFINE GENERAL DEMOLITION WORK TO BE COMPLETED. COORDINATE ALL SPECIFIC SITE AND BUILDING DEMOLITION REQUIREMENTS WITH THE G.C.K. G.C./CM SHALL COORDINATE REMOVAL OF EXISTING FURNITURE AND EQUIPMENT W/ THE OWNER.L. COORDINATE W/ ELECTRICAL, MECHANICAL & FIRE PROTECTION CONTRACTORS FOR ANY ADDITIONAL DEMOLITION REQUIREMENTS RELATED TO THEIR WORK.GENERAL DEMOLITION NOTES:REFERENCED KEYNOTES2.03 ADD NEW WALL, 2X4 @ 24" O.C. WD STUD WALL WITH 5/8" GYP. BD. ON EACH SIDE.2.04 ADD NEW DOOR.2.05 INFILL DOOR OPENING, MATCH EXISTING.2.06 FINISH OFF TOP OF WALL TO UNDERSIDE OF EXISTING ROOF STRUCTURE.2.07 ADD NEW 2X4 WD STUD WALLS FULL HEIGHT AROUND EXISTING ELECTRICAL BOX.2.09 NEW FRAME AND OPENING.2.10 ADD NEW STEP FOR DOOR AND STORAGE SPACE.2.11 THESE WALLS WILL NOT GO UP TO DECK.D.01 REMOVE EXISTING CEILING.D.02 REMOVE EXISTING FLOORING.D.04 REMOVE EXISTING DOOR.D.05 REMOVE EXISTING RAISED STAGE.D.06 REMOVE EXISTING GUARD RAIL.D.07 REMOVE EXISTING STAIR TO MEZZANINE.D.08 REMOVE EXISTING MEZZANINE.D.09 REMOVE PORTION OF EXISTING WALL FOR NEW OPENING.R.01 ELECTRICAL BOX TO REMAIN.R.02 EXISTING RAMP TO REMAIN.NORTHNORTH# Date Description