My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. PCSR 07-25-2023
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2023
>
07-25-2023
>
4.3. PCSR 07-25-2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2023 2:35:43 PM
Creation date
7/20/2023 12:54:34 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Phone: 763.635.1000 <br /> <br />www.ElkRiverMN.gov <br /> <br />July 20, 2023 <br /> <br />Aegir Brewing Company LLC VIA EMAIL: aegirbrewco@gmail.com <br />Tim Jones <br />19050 Industrial Blvd. NW <br />Elk River, MN 55330 <br /> <br />RE: Conditional Use Permit Application Comment Letter, Case File No. CU 23-17 <br /> <br />Dear Mr. Jones: <br /> <br />Thank you for your application for a Conditional Use Permit (CUP) to amend your current CUP <br />(CU 20-15) to expand your bar/tavern/nightclub located at the address listed above. I will be <br />reviewing your application and preparing the staff reports for the Planning Commission and City <br />Council. <br /> <br />On June 28, 2023, the city received your application for the above use. Per Minnesota State Statute <br />§15.99, the city is required to make a decision within 60 days of receipt of the completed application. <br />Subd. 3 of that section requires the city to notify an applicant within 15 business days if information <br />is missing, delaying the start of the 60-day review period. A city may extend the 60-day review period <br />up to 120 days to complete the review. <br /> <br />While additional clarifying information is required, the application for a CUP has been deemed <br />complete, and the 60-day review period starts. This application has been assigned Case Number CU <br />23-17 and is scheduled to be reviewed by the Planning Commission on Tuesday, July 25, 2023, at <br />6:30 p.m. at the Elk River City Hall, 13065 Orono Parkway. With a Planning Commission <br />recommendation on that date, the City Council will review your application on Monday, August 21, <br />2023. <br /> <br />Staff conducted a site plan review and had the following comments: <br /> <br />Building Department <br /> Stair to mezzanine required to remain per mechanical code 306.5 to access/service <br />mechanical equipment. <br /> If mechanical systems location are changing, provide plans showing new location. A <br />licensed mechanical engineer will be required to apply for a mechanical permit & provide <br />design plans for equipment. <br /> Sound stage required to be accessible, provide design. <br /> Both sound stage occupant loads not listed on plans
The URL can be used to link to this page
Your browser does not support the video tag.