Laserfiche WebLink
LANDSCAPE <br />-Oilk <br />F; �0 lll�-t - �Z- I �-- <br />; Iip•l:iii 0 <br />1711 <br />(3,20) 5I58-�4455 <br />A'AA <br />DATE: 6/22/2023 <br />Arkin for the folllowing: <br />1. Erosion Control Blanket t�hiat was in the specs is changed to Rolanka B1OD-Mat40 Erosion Control Blanket <br />The Original Contract Amount wais $ 231,444.00 <br />Net Change by Previously Authorized Change Orders $i -0- <br />The Contract Amount Prior to This Change, Order was $ 231,444,00 <br />The Contract wi�ll be Increased By This Change Order in the Amount oif $ 25,000M <br />The New Contract Amount Including This Change Order Will Be $ 25,6,44,4.010 <br />The Contract Time will be unchanged'. <br />as a INN <br />SIGINATUk-V- DATE <br />BRANDON WISNER, Engineering Project Manag <br />CITY OF ELK RIVER <br />13065 ORONO PARKWAY <br />ELK RIVER, MN 55330 1 <br />6.23.2023 <br />SIGNATURE <br />DATE <br />